Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T19CM06136
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/29/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 11/08/2019 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Comment not addressed. [Initial comment: Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.] |
| 11/08/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Correct the calculations. Your occupancy calculations on sheet G002 shows a total of 65 people and you will require four water closets, not two. [Initial comment: Calculate the number of required plumbing fixtures for the enlarged building. Reference: Section 2902.1, IBC 2018.] 2. Provide overflow protection for the roof, see Section 1108, IPC 2018. [Initial comment: Provide roof drainage calculations and plans. Provide overflow protection for the roof. Reference: Sections 1101, 1106 and 1108, IPC 2018.] |
| 11/08/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a COMcheck envelope analysis for the addition to the building. [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018.] 2. Explain the ventilation calculations for the control room and the electrical room based on "enclosed garages". [Initial comment: The City of Tucson has not adopted ASHRAE Standard 62-1 as an approved method for calculating ventilation requirements. Provide calculations to show that the ventilation system is sized in accordance with Section 403.3, IMC 2018; for HVAC systems serving multiple zones (e.g. HP-1 and HP-2), see Section 403.3.1.1.2.3, IMC 2018.] |
| 11/18/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |