Permit Number: T19CM03868
Parcel: 14041134D

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T19CM03868
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/31/2019 ELISA HAMBLIN ZONING REVIEW Approved
05/31/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide heating/cooling load calculations for the two new A/C units. Note that the design temperature for Tucson is 104 degrees Fahrenheit.
2. Cooking appliances that are not required to have a hood are required to have general exhaust at 0.70 CFM per square foot. The basis for the exhaust is 100-square feet per appliance. Reference: Section 507.3, IMC 2018.
05/31/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Correlate new panel numbers with the electrical floor plans.
2. Please provide full compliance with the Tucson/Pima County Outdoor Lighting Code for the exterior lighting..
Ref; 2017 NEC, 2018 IBC sec 107.2.1, Tucson/Pima County Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements.
05/31/2019 EHAMBLI1 ENGINEERING REVIEW Passed
05/31/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
05/31/2019 ROBERT SHERRY WATER REVIEW Completed
05/31/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The developed pipe length from the water heater to the furthest sink appears to be over 50-feet. Provide a recirculation system or heat-trace system. reference: Section 607.2, IPC 2018.
2. The specified water heater has a side inlet for the cold water. Provide a vacuum relief valve. reference: Section 504.2, IPC 2018.
3. Provide a structural design and calulations for the water heater support platform and show how the platform is attached to the wall.
05/31/2019 JPEELDA1 FIRE REVIEW Approved
05/31/2019 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/31/2019 QJONES1 OUT TO CUSTOMER Completed
05/31/2019 QJONES1 REJECT SHELF Completed
05/31/2019 QJONES1 APPROVAL SHELF Completed