Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T19CM02736
Parcel: 117091850

Address:
1105 S 7TH AV

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T19CM02736
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/25/2019 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T19CM02735 - New Residential Building (Residential Use - SFR)
Building Plan Review (1st Review)
1105 S. 7th Avenue

TRANSMITTAL DATE: April 25, 2019

DUE DATE: May 5th, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the plot plan for 1105 S. 7th Avenue but cannot approve it at his time. A lot split application was processed for review and approval but the documents have not been brought in to PDSD for final signoff by Zoning. All documents (recorded) related to the lot split S18-085 must be brought in before further review by zoning for this SFR application.

2. COMMENT: As noted the lot split application has not been finalized. Before zoning can review the proposed application further a copy of the recorded subdivision documents including the Survey drawing must be available for review and comparison to ensure consistency with what was approved in the lot split.

3. COMMENT: Zoning will do a review of the proposed SFR application once the Lot Split documents are finalized and the SFR application is resubmitted for review.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: As noted above in the comments.
05/01/2019 DMCCART1 BUILDING-RESIDENTIAL REVIEW Review Comp Zoning requires resubmittal
05/01/2019 LOREN MAKUS ENGINEERING REVIEW Passed