Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - T19CM02277
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/04/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G0.001; Sheet Index: Please revise the Sheet Index to indicate only the sheets in this submittal (Revision #2). Please add sheets to this set that indicate material strengths and special inspections required (for Revision #2). 2. Sheets S1.102 through S1.102.D, S1.103 through S1.103.C, and S1.104 through S1.104.C: Please add north arrows to all plans. 3. Sheets S1.102.A and S1.102.B: Please indicate Floor Framing Keynote 11 on these plans. 4. Sheets S1.102.A through S1.102.D; Floor Framing Keynotes (Note 12): A screenwall Detail 115 is referenced in this note. Please add that sheet to this review set. 5. Sheets S1.102.A through S1.102.D; Floor Framing Keynotes (Note 17): Please add to reference Detail 203 for framing around the opening. 6. Sheets S1.102.A through S1.102.D: Floor Framing Keynotes (Note 18): Please add to reference Details 206 and 207 for mechanical unit support framing. 7. Sheets S1.102.A through S1.102.D; Floor Framing Keynotes (Note 25): Please add to reference Details 205 and 206 for framing around openings. 8. Sheets S1.103.a through S1.103.C; Floor Framing Keynotes (Note 10): Please add to reference Detail 203 for framing around the opening. 9. Sheet S1.104.A; Roof Framing Keynotes (Note 5): Please add to reference Details 206 and 207 for mechanical unit support framing. 10. Sheet S1.104.A; Roof Framing Keynotes (Note 8): Please add to reference Detail 205 for roof drain framing around opening. 11. Sheets S1.104.A through S1.104.C; Roof Framing Keynotes (Note 9): Please add to reference Details 205 and 206 for framing around openings. 12. Structural Calculations: Please provide all calculations for roof, third floor, and second floor framing and all stairs. Include key plans in the calculations indicating framing member identifications that coordinate plan members with their structural design calculations. 13. General: Please provide the Special Inspection Certificate with Parts A and B completed. That form is located on the City of Tucson website www.tucsonaz.gov/PDSD. 14. General: Please provide written responses to all review comments. Reviewed by Eric Newcomb Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/28/2019 | QJONES1 | APPROVAL SHELF | Completed |
06/28/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
06/28/2019 | QJONES1 | REJECT SHELF | Completed |