Permit Number: T19CM01062
Parcel: 136254100

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T19CM01062
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/08/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1.Structural Calculations Sheet 4 - Roof Framing Community Building. West wall ilustrates four lintels labeled LT3, and one labeled LT4 . Building Plans Sheet S3.3 - Community Building Framing Plan ; West wall illustrates four lintels labeled LT1, and one labeled LT3. Please clarify specified lintels and illustrate on plans.IBC107.2.1.
2. Obtain permit for storage/hotbox building. IBC 107.2.1
03/11/2019 MARTIN BROWN FIRE REVIEW Approved
03/25/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, etc.). Provide a site plan showing the installation of the water service to the buildings. Note that the civil utilities drawing included in the development package is incomplete and does not show all of the required pipe sizes or the pipe material. Reference: Sections 104.2 and 107.2.1, IBC 2018.
2. A separate permit is required for the installation of a private sewer collection system and will require a review of the system design by the Pima County Department of Environmental Quality. Reference Title 18, R18-9-E302, 4.02 General Permit, Arizona Administrative Code.
3. Revise the design of the hub drain per Section 802.4.2, IPC 2018.
4. Show how a vent is to be provided for the exterior drinking fountain. Reference: Section 901.2.1, IPC 2018.
5. Provide the slope of the proposed rain gutters. Reference: Section 1106.6, IPC 2018.
6. Provide roof drain calculations for the flat roof. Provide secondary roof drains for the roof. Reference: Sections 1106.5 and 1108.1, IPC 2018.
03/25/2019 ROBERT SHERRY WATER REVIEW Reqs Change The development package does not show any water service to the community building. Coordinate with the civil design.
03/26/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The COMcheck envelope compliance certificate calls for R-44 cavity insulation with an additional R-5.0 continuous insulation in the roof; where is this shown on the plans? Reference: Section 107.2.1, IBC 2018.
2. Provide thermal load and HVAC equipment-sizing calculations to confirm the capacities of the specified heat pumps. Reference: Section C403.1.1, IECC 2018.
3. Revise the note on sheet A6.2 to call for all exterior window types to have the maximum SHGF and U-factors as shown in the COMcheck calculations.
04/02/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. REF; Outdoor Lighting.
(a) Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior site lighting. Since the site lighting is fed from the house panel located at the Community Building the Outdoor site lighting will be assigned to this permit.
(b) Please clarify where the building exterior luminaires are fed from? The site plan shows them fed from 'S' panels. There are no panel schedules or line diagrams that include these panels. Please include this information on the plans.
2. There are 2 electrical plan sheets labeled as 'E1.1'. Please clarify.
3. Please provide a legend or explanation what the encircled letters and numbers mean that are shown on the sides of the panel schedules next to the circuits, and on the lighting plan for the boxes with circles inside.
4. There is a note at the bottom of the plan sheet E1.5 referencing plan sheet E0.2 for information about the "Meeting Room Induction loop". Could not locate plan sheet E0.2. Please clarify.
5. Provide a complete line diagram for the electrical service (s) that includes the Community building and load calcs, grounding, AIC ratings, all feeder sizes and types, equipment locations on the plans, etc., as required per the City of Tucson Commercial Plan Submittal Requirements (ELECTRICAL).
6. Provide complete panel schedules for panels 'H' and 'HA'.
7. Show the locations for panel 'C', water heater, EC, on the electrical floor plans.
8. The electrical floor plan shows FC 4, FC 5. The panel schedule for panel 'C' only shows FC 3. Please clarify.
9. Indicate GFI protection for receptacles where applicable per NEC art 210.
10. Provide for Tamper Resistant receptacle per NEC art 406.12, 518.2.
11. Because there are several loadcenters in the area, indicate a panel designation as well as the branch circuit number for all outlets, receptacles, equipment, lighting and correlate with the associated panel schedule.
12. Provide a complete luminaire schedule.
13. Provide compliance with the 2018 IECC for lighting.
Ref; 2017 NEC, 2018 IBC 107.2.1, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
04/04/2019 LOREN MAKUS ENGINEERING REVIEW Approved
04/05/2019 STEVE SHIELDS ZONING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
04/22/2019 AMARTIN1 OUT TO CUSTOMER Completed