Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T19CM00152
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/14/2019 | GPERU1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 01/14/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Please provide written responses to all plan review comments. 1. Please submit one copy of the geotechnical report as referenced in item #1 of the FOUNDATIONS section on sheet S1.0. 2. Keynote #7 on S2.0 is referencing a typical detail for slab reinforcement which is not contained in the structural details; please provide the referenced detail. IBC 107.7.1. 3. Indicate the type and sizes of all wood ledgers called out on details 501, 502, 506 and 510. Specify number and type of fasteners at all framing connections. IBC 107.2.1. 4. Verify that the separation of exits is not less than one-third of the length of the maximum overall diagonal dimension of the area servied where 2 or more exits are required. IBC 1007.1.1. |
| 01/22/2019 | MASHFOR1 | FIRE | REVIEW | Approved | Please submit required occupant load on plan set. Deferred submittal shall be required for Sprinkler/Alarm for new building A-2 |
| 01/23/2019 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. The development package is not a substitute for a complete site plan. Reference: Section 107.2.5, IBC 2018. 2. Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the anticipated total water demand that will be served by the water meter. Reference: Section 107.2.1, IBC 2018. |
| 01/24/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the energy code analysis for the building envelope, coordinating the building components used in the analysis with those shown on the drawing (see the U-value and SHGF on sheet A5). Reference: Section C303.1, IECC 2018, as amended by the City of Tucson. 2. In the COMcheck Envelope Compliance Certificate, the high efficiency HVAC option was selected as the additional efficiency package requirement to comply with Section C406, IECC 2012. In the Interior Lighting and Mechanical Compliance Certificates, however, reduced indoor lighting power option is noted as the way to comply with the additional efficiency package requirement. Coordinate the approach to be used to comply with Section C406.1, IECC 2018. |
| 01/24/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a site drawing showing the location of the proposed gravity grease interceptor, the size, route, and slope of the building sewer, the location of all cleanouts in the building sewer, and the location of the connection of the building sewer to the public sewer. Reference: Section 107.2.1, IBC 2018. 2. Provide a low-pressure cutoff for the booster pump system per Section 606.5.5, IPC 2018. 3. With regard to item 20 of the Plumbing Specifications, interior waste piping upstream of the grease interceptor shall have a minimum slope of ΒΌ" per foot (2% slope). Reference: Section 704.1, IPC 2018. |
| 02/06/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T19CM00152 - New Building (Retail / Food Service) Building Plan Review (1st Review) Retail and Mod Pizza 9210 S. Houghton Road - I-2 Zoning TRANSMITTAL DATE: February 6, 2019 DUE DATE: February 11, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the approved tentative plat. While the building footprint is consistent with the approved revised Tentative Plat as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans. While the building footprint is consistent there were a few site changes that did not match the approved TP. However per Steve Shields they were not substantial enough to require a revision to the TP. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure continued consistency with the approved Tentative Plat. 3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the tentative plat will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the plans have been reviewed and approved by the PDSD Commercial Plan Reviewers and zoning has verified consistency with the tentative plat, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building plans |
| 02/07/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 02/07/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | T19CM00152 1) Once DP19-0008 has been approved and any outstanding department building review comments are addressed Engineering can conduct an over the counter review and approval of the building plans 2) Make sure to update the building plans with the approved version of the DP upon final submittal John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/08/2019 | QJONES1 | APPROVAL SHELF | Completed |
| 02/08/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
| 02/08/2019 | QJONES1 | REJECT SHELF | Completed |