Permit Review Detail
Review Status: Completed
Review Details: WALK THRU - COMM
Permit Number - T19CM00015
Review Name: WALK THRU - COMM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/08/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 01/18/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet PV2.0; Site Plan: Please indicate the separation distances between all of the canopies on this sheet. 2. Sheet S3; Plan View: The title of the plan view indicates Tee 4, while the Section B indicates Canopy 2. Please clarify (Details indicate Canopy 2). 3. Sheet S5; Detail 101: Note 3 indicates a 12 gauge purlin at 101A. Is that purlin size indicated in the drawings or calculations presented here? Remove from this sheet as required. 4. General: It would be helpful in the future if the steel frame model indicated in the calculations (Pages 25, 50, and 80 in this set) referenced the canopy number as shown in the drawings. 5. General: Please provide written responses to all review comments. Review by Eric Newcomb Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov |
| 01/30/2019 | DAVID RIVERA | ZONING | REVIEW | Passed | |
| 01/31/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. The service main breaker must be GFI equipped Per NEC art 230.95, 240.13. This requires a supply side PV interconnection Per NEC art 705.12D(3). Ref; 2011 NEC |
| 02/01/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed |