Permit Number: T18CM09799
Parcel: 11310001A

Address:
1545 E COPPER ST

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T18CM09799
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2019 MASHFOR1 FIRE REVIEW Approved
01/14/2019 ROBERT SHERRY WATER REVIEW Completed
01/17/2019 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T18CM09799 - Civic/Education Use - Salpointe High School
Building Plan Review (1st Review)
1545 E. Copper Street - PAD 17 Zoning

TRANSMITTAL DATE: January 17, 2018

DUE DATE: January 18, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Zoning has reviewed the T.I. for the new roof mounted AC units. Mechanical equipment must be screened entirely from view along the street frontage. There does not appear to be an exception to the screening of mechanical equipment in the PAD document, therefore it defaults to the current code requirements.


2. COMMENT: Provide building elevation drawing of the specific building where the new AC units will be placed and demonstrate that the equipment is screened from the view along the street frontage with the existing parapet walls.


3. COMMENT: Zoning will review the building plans on the next submittal to assure that any revisions made to the building plans do not affect zoning requirements and that all PDSD commercial plans reviewers have also approved the building plans.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov
01/22/2019 JOHN VAN WINKLE ENGINEERING REVIEW Passed
01/25/2019 STANTEC 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/25/2019 KROBLES1 OUT TO CUSTOMER Completed