Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T18CM09112
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/14/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. A revised development package showing this work must be reviewed and approved. 2. These plans must be reviewed and approved by the design professional. Provide clear elevations showing the panels and associated structures for all sides of the structure. 3. On the site/DP for this project, show the effective floodplain areas. If the structure or structures supporting these panels is (are) in the floodplain, a floodplain use permit is required. |
12/20/2018 | GPERU1 | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Please provide the installation specifications for the Heyco SunStars grounding and bonding system and revise detail on PV 4.0. Provide the panel racking system used to attach the solar array to the steel purlins. Provide details for installation and fastening to roof purlin system. S0.2 IBC 107.2.1 3. Is the shade structure existing? Unable to determine from review of plans existing and new structues and foundations. Specify on plans all existing structures. S0.1 IBC 107.2.1 4. Please copy the electrical data spec. sheets for the panels and inverter on the full-size plan sheets. Please provide written responses to all plan review comments. |
12/20/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Is the shade structure existing? Unable to determine from review of plans existing structues and foundations. Specify on plans all existing structures. S0.1 2. Detail 112 on S0.3 shows a reinforcement detail for the LIGHT POLE BASE AT EXTENDED CONCRETE COLUMN. Item #5 on the notes section indicates mounting the solar structure column in the existing column. Provide the permit number and inspection verification of the reinforcement called out on the detail. IBC 107.2.1 3. Provide a foundation plan where all new (existing?) columns are located. IBC 107.2.1 4. Provide dimensions for determining the spans of all purlins and beams. IBC 107.2.1 Please provide written responses to all plan review comments. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/23/2019 | QJONES1 | APPROVAL SHELF | Completed |
01/23/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
01/23/2019 | QJONES1 | REJECT SHELF | Completed |