Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T18CM08177
Parcel: 14109030A

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL TI

Permit Number - T18CM08177
Review Name: 3RD PARTY REVIEW - COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/16/2018 MARTIN BROWN FIRE REVIEW Approved
11/07/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change T18CM08177

1) Engineering has reviewed the building plans and they appear to be in conformance with the unapproved development package (DP18-0250)
2) Coordinate with Development Package (DP) to ensure that roof drains scupper underneath sidewalks. Reference City of Tucson Technical Standards Manual (TSM) section 7-01.4.1.E
3) Once the DP has been approved and any outstanding commercial review comments have been addressed, Engineering can conduct an over the counter review of the building plans. Call or Email to Schedule

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
11/08/2018 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T18CM08177 - New Building (Commercial - Research and Product Development)
Related to DP18-0235
Building Plan Review (1st Review) Skyline Labs
7960 S. Kolb Road - I-2 Zoning

TRANSMITTAL DATE: November 8, 2018

DUE DATE: November 9, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has reviewed the building plans for compliance with the current unapproved version of the development package. While the building footprint is consistent with the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the building plans have been approved by the 3rd Party and PDSD Commercial Plans reviewers.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include a copy as reference of the approved and PDSD stamped version of the DP with the next building plan submittal.

3. COMMENT: If any changes are necessary, due to the 3rd Party or PDSD Commercial Plans reviewers comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning.

4. COMMENT: Once the plans have been reviewed and approved by the 3rd Party and PDSD Commercial Plan Reviewers, and zoning has verified consistency with the approved PDSD copy of the signed DP, the building plans can be approved by zoning.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans
11/09/2018 ROBERT SHERRY WATER REVIEW Completed
12/19/2018 STANTEC 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
12/19/2018 KROBLES1 OUT TO CUSTOMER Completed