Address Search: 7960 S KOLB RD
Search
Parcel Attributes
| Parcel | 14109030A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-2 |
| Tucson Ward | Ward 4 |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 7960 S KOLB RD
Date - 07/03/2026 4:08 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 7960 S KOLB RD
Date - 07/03/2026 4:08 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T18SA00347 | APPROVED | 08/07/2018 | N/A | Individual Parking Plan |
Permits
Address: 7960 S KOLB RD
Date - 07/03/2026 4:08 p.m.
Total Number Of Permits - (69)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T19FC01047 | Expired | 12/17/2019 | 10/18/2020 | Fire Construction Permit | Fire Alarm & Detection Systems - FIRE ALARM MODIFICATION; Fire Alarm Systems - Devices Modified: 10; Additional Plan Reviews: 1 | |
| DP18-0250 | Complete | 10/05/2018 | 04/26/2021 | Development Package | E SITE/GRADING - Skyline Labs, new bldg addition and tenant improvements. | |
| TC-COM-0925-01641 | Complete | 09/08/2025 | 08/10/2026 | BLDG 4 | Commercial Building | This project consists of limited mechanical, electrical and plumbing modifications to support the installation of skids for column leach testing. No architectural scope is included in this project. |
| TF-FOP-0626-00913 | Complete | 06/30/2026 | 06/30/2027 | Fire Operational Permit | Hazardous materials on site | |
| TR-ROW-0626-00756 | Issued | 06/29/2026 | 10/11/2026 | Right-of-Way (ROW) | Permit for two (2) poles closest to listed location. The Tucson Police Department (TPD) was awarded an AZDPS grant for camera and technology improvement along AZ highways. TPD has purchased 60 solar powered cameras to be placed on City of Tucson (COT) streetlights, closest ingress & egress locations to AZ highways within city limits. Attached, will be a spreadsheet with all the pole numbers and addresses related to this project, a traffic control plan, and an equipment data installation sheet. Installation of these cameras will NOT involve using the power from the streetlight. Installation will NOT involve drilling or modifying the poles, the cameras will be affixed with metal bands. Please see attachments for further information. | |
| TF-FOP-0626-00773 | Complete | 06/01/2026 | 06/26/2027 | BLDG 1 | Fire Operational Permit | LP Gas |
| TF-FOP-0626-00775 | Complete | 06/01/2026 | 06/26/2027 | BLDG 3 | Fire Operational Permit | Flammable and Combustible Liquids |
| TF-FOP-0626-00776 | Complete | 06/01/2026 | 06/26/2027 | BLDG 2 | Fire Operational Permit | Industrial Ovens |
| TF-FOP-0626-00777 | Complete | 06/01/2026 | 06/26/2027 | BLDG 1 | Fire Operational Permit | Compressed Gases |
| TF-FOP-0626-00778 | Complete | 06/01/2026 | 06/26/2027 | Fire Operational Permit | Hot Work Operations | |
| T19FC00252 | Expired | 04/09/2019 | 04/10/2020 | Fire Construction Permit | Automatic Fire Extingshing Sys - INSTALLATION OF UNDERGROUND FIRE ELINE.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply | |
| TR-UTL-0326-00541 | Inspections | 03/18/2026 | 08/02/2026 | Right-of-Way (ROW) - Utility | PRJ311411-1: Cox to overlash & attach 404' of new CATV fiber for system tie. | |
| TR-UTL-0325-00426 | Complete | 03/12/2025 | 04/26/2025 | Right-of-Way (ROW) - Utility | Installing 1" water service with Meter & Box | |
| TF-FOP-0224-00185 | Complete | 02/09/2024 | 04/16/2026 | Fire Operational Permit | Hot Work | |
| TF-FOP-0224-00185 | Complete | 02/09/2024 | 04/16/2026 | BLDG 1 | Fire Operational Permit | Hot Work |
| TF-FOP-0224-00185 | Complete | 02/09/2024 | 04/16/2026 | BLDG 2 | Fire Operational Permit | Hot Work |
| TF-FOP-0224-00185 | Complete | 02/09/2024 | 04/16/2026 | BLDG 3 | Fire Operational Permit | Hot Work |
| TF-FOP-0224-00185 | Complete | 02/09/2024 | 04/16/2026 | BLDG 4 | Fire Operational Permit | Hot Work |
| TF-FOP-0224-00186 | Complete | 02/09/2024 | 04/16/2026 | Fire Operational Permit | Flammable and Combustible Liquids | |
| TF-FOP-0224-00186 | Complete | 02/09/2024 | 04/16/2026 | BLDG 1 | Fire Operational Permit | Flammable and Combustible Liquids |
| TF-FOP-0224-00186 | Complete | 02/09/2024 | 04/16/2026 | BLDG 2 | Fire Operational Permit | Flammable and Combustible Liquids |
| TF-FOP-0224-00186 | Complete | 02/09/2024 | 04/16/2026 | BLDG 3 | Fire Operational Permit | Flammable and Combustible Liquids |
| TF-FOP-0224-00186 | Complete | 02/09/2024 | 04/16/2026 | BLDG 4 | Fire Operational Permit | Flammable and Combustible Liquids |
| TF-FOP-0224-00187 | Complete | 02/09/2024 | 04/16/2026 | Fire Operational Permit | LP Gas | |
| TF-FOP-0224-00187 | Complete | 02/09/2024 | 04/16/2026 | BLDG 1 | Fire Operational Permit | LP Gas |
| TF-FOP-0224-00187 | Complete | 02/09/2024 | 04/16/2026 | BLDG 2 | Fire Operational Permit | LP Gas |
| TF-FOP-0224-00187 | Complete | 02/09/2024 | 04/16/2026 | BLDG 3 | Fire Operational Permit | LP Gas |
| TF-FOP-0224-00187 | Complete | 02/09/2024 | 04/16/2026 | BLDG 4 | Fire Operational Permit | LP Gas |
| TF-FOP-0224-00188 | Complete | 02/09/2024 | 04/16/2026 | Fire Operational Permit | Compressed Gases | |
| TF-FOP-0224-00188 | Complete | 02/09/2024 | 04/16/2026 | BLDG 1 | Fire Operational Permit | Compressed Gases |
| TF-FOP-0224-00188 | Complete | 02/09/2024 | 04/16/2026 | BLDG 2 | Fire Operational Permit | Compressed Gases |
| TF-FOP-0224-00188 | Complete | 02/09/2024 | 04/16/2026 | BLDG 3 | Fire Operational Permit | Compressed Gases |
| TF-FOP-0224-00188 | Complete | 02/09/2024 | 04/16/2026 | BLDG 4 | Fire Operational Permit | Compressed Gases |
| TF-FOP-0224-00189 | Complete | 02/09/2024 | 04/16/2026 | Fire Operational Permit | Industrial Ovens | |
| TF-FOP-0224-00189 | Complete | 02/09/2024 | 04/16/2026 | BLDG 1 | Fire Operational Permit | Industrial Ovens |
| TF-FOP-0224-00189 | Complete | 02/09/2024 | 04/16/2026 | BLDG 2 | Fire Operational Permit | Industrial Ovens |
| TF-FOP-0224-00189 | Complete | 02/09/2024 | 04/16/2026 | BLDG 3 | Fire Operational Permit | Industrial Ovens |
| TF-FOP-0224-00189 | Complete | 02/09/2024 | 04/16/2026 | BLDG 4 | Fire Operational Permit | Industrial Ovens |
| TZ-CMP-0123-00051 | Void | 01/27/2023 | N/A | BLDG 3 | Zoning Compliance | Adding a shed for storage. |
| T01BU02987 | FINAL | 10/12/2001 | 04/21/2002 | SPKLR | FIRE SPKR:RELOCATE 1 | |
| T02BU02549 | FINAL | 09/20/2002 | 03/26/2003 | SPKLR | FIRE SPRINKLER:RELOCATE 1 | |
| T02CM05206 | FINAL | 11/08/2002 | 07/23/2003 | COMBO | NEW:STORAGE | |
| T03BU01233 | WITHDRWN | 05/16/2003 | N/A | TANKS | INSTALL:PROPANE TANK | |
| T03CM02401 | WITHDRWN | 05/16/2003 | N/A | COMBO | INSTALL:BACK UP GENERATOR | |
| T03EL00021 | FINAL | 01/07/2003 | 08/12/2003 | ELECT | UPGRADE:ELECTRIC 200 AMP 480 VOLT | |
| T03EL01715 | WITHDRWN | 08/26/2003 | N/A | ELECT | UPGRADE:ELECTRIC 400AMP TO 1200AMP | |
| T04EL00922 | FINAL | 05/05/2004 | 02/13/2005 | ELECT | UPGRADE:ELECTRIC TO 1200AMP | |
| T05BU01830 | FINAL | 07/20/2005 | 01/30/2006 | SPKLR | FIRE SPKR: ADD 2 | |
| T05OT01270 | C OF O | 05/18/2005 | 12/07/2005 | C-OF-O | C OF O:MANUFACTURING | |
| T05OT01450 | FINAL | 06/10/2005 | 06/14/2006 | SIGN | SIGN: 9162 MER CORPORATION | |
| T07CM00470 | WITHDRWN | 02/07/2007 | N/A | COMBO | NEW INDUSTRIAL BUILDING | |
| T10EL02357 | FINAL | 10/14/2010 | 04/18/2011 | ELECT | UPGRADE ELECTRIC FROM 200-400 AMPS | |
| T15EX00439 | CLOSED | 04/01/2015 | 05/31/2015 | EXCAV | THIS JOB WILL REQUIRE TO TRENCH +/- 5' FROM AN EXISTING PEDESTAL TO BOTTOM OF POLE TO PLACE (1) 4" CONDUIT. THIS PERMIT WILL REPLACE U2014002404 EXPIRED 12/15/2015- WORK ORDER # E.697866 | |
| T16FC00149 | FINAL | 10/26/2016 | 07/26/2017 | FIRECONS | Modify existing wet pipe fire sprinkler system | |
| T17FC00262 | FINAL | 04/03/2017 | 11/08/2017 | FIRECONS | Modify existing wet pipe fire sprinkler system | |
| T18CM08177 | C OF O | 10/12/2018 | 06/08/2020 | BLDG 2 | COMBO | NEW INDUSTRIAL BLDG |
| T18CM08767 | C OF O | 11/02/2018 | 02/16/2021 | BLDG 3 | COMBO | OFFICE |
| T18CM09589 | C OF O | 12/07/2018 | 10/06/2020 | BLDG 1 | COMBO | ASSAYERS LAB |
| T18CM10078 | L OF C | 12/31/2018 | 06/08/2020 | COMBO | FOUNDATION ONLY | |
| T19CM03867 | FINAL | 05/31/2019 | 11/07/2020 | COMBO | FENCED SITE AREA FOR TANK, WITH WITH CONCRETE PAD | |
| T19FC00086 | FINAL | 01/30/2019 | 06/08/2020 | FIRECONS | NEW FIRE SPRINKER SYSTEM | |
| T19FC00218 | FINAL | 03/26/2019 | 09/23/2020 | BLDG 1 | FIRECONS | Modify existing Sprinkler system to accomodate Tenant |
| T19FC00395 | FINAL | 05/23/2019 | 12/17/2019 | FIRECONS | MODIFICATION TO AN UNDERGROUND FIRELINE. | |
| T19FC00485 | FINAL | 06/24/2019 | 01/30/2021 | BLDG 3 | FIRECONS | Modification to an existing Fire Sprinkler System |
| T19FC00835 | FINAL | 10/09/2019 | 04/29/2020 | BLDG 2 | FIRECONS | FIRE SYSTEM IN RISER ROOM TO MONITOR SPRINKLER WATER FLOW AND TAMPER |
| T19FO00416 | FINAL | 06/05/2019 | 11/23/2020 | FIREOPER | ARGON TANK ENCLOSURE | |
| T19RW01310 | FINAL | 03/12/2019 | 02/17/2019 | ROW | OVERLASH 120 FT OF FIBER, DIG TWO 3X3X3 PITS IN DIRT TO EXPOSE CONDUITS FOR FIRST DIGITAL FIBER | |
| T98BU01645 | FINAL | 06/30/1998 | 07/28/1999 | SPKLR | FIRE SPKR:NEW 155 | |
| T98CM00097 | WITHDRWN | 01/08/1998 | 10/06/1998 | COMBO | SITE REVIEW:ADDITION & REMODEL OFFICE |
Plans
Address: 7960 S KOLB RD
Date - 07/03/2026 4:08 p.m.
Total Number Of Plans - (1)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-18-0250 | Active | 10/05/2018 | 04/26/2021 | -- Commercial Water Harvesting Ordinance | E SITE/GRADING - Skyline Labs, new bldg addition and tenant improvements. |