Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T18CM07845
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/03/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
12/10/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
12/17/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The architectural floor plan shows a fire separation between the waste storage room and the remainder of the building but the mechanical plan needs to show fire dampers for the duct penetrations into the waste storage room. Also, the code review on sheet G-002 needs to be revised to indicate the waste storage room is an H-3 occupancy not an S-1 occupancy due to the excess quantities of hazardous materials being stored. [Initial comment: Provide fire separation for the storage room (H-3 occupancy) and the remainder of the building. Reference: Sections 607.5.3, and 607.6.1, IMC 2012.] |
12/17/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The 8" x 8"primary scuppers noted on drawing AR-104 are adequate for the roof area being drained but the calculated size for the secondary scuppers is incorrect. Scuppers are essentially weirs, not horizontal pipes (a civil engineer can show you how to determine the required scupper width). Assuming that each secondary scupper is located 2" above the lowest point of the roof and has a 2" head, the minimum width is 7.5". The secondary scuppers are required to have an "…end point of discharge separate from the primary system." In addition, the minimum dimension of a scupper is 4-inches. Show the secondary scuppers on the roof plan and as appropriate, on the building elevations. [Initial comment: Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.] |
12/20/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Ref; Plan Sheet EL101, EL102. The lumen Calcs on these plans do not correlate with each other. Please clarify. Ref; 2012 IBC sec 107.2.1, 2012 Tucson/Pima County Outdoor Lighting Code. |
12/21/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM07845 - New Building (Industrial - Test Equipment Facility) Building Plan Review (2nd Review) Sion Power 2900 E. Elvira Road - I-1 Zoning (related to DP18-0132) TRANSMITTAL DATE: December 21, 2018 DUE DATE: December 27, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the approved development package issued on October 4, 2018. While the building footprint and the site revisions are consistent with the approved DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc) zoning cannot approve the building plans until the all PDSD Commercial Plans reviewers have approved the building plans. 2. COMMENT: Once the plans have been reviewed and approved by the PDSD Commercial Plan Reviewers the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building plans |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/26/2018 | QJONES1 | APPROVAL SHELF | Completed |
12/26/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
12/26/2018 | QJONES1 | REJECT SHELF | Completed |