Permit Number: T18CM07663
Parcel: 140290410

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM07663
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/27/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
11/27/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the description of the envelope assemblies to correspond to those shown on the drawings (e.g. no continuous insulation is shown on the wall and roof sections). [Initial comment: Provide energy code compliance calculations for the addition to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012.]
2. Clarify the difference between the total cooling load capacity for HP-B as noted in the reply to the comments and the load calculations versus the scheduled cooling load capacity. [Initial comment: Coordinate the load calculations for HP-A and HP-B with the scheduled capacities. (Note that the load calculations for HP-A describe the unit as a split system rather than a packaged unit.) Reference: Section C403.2.2, IECC 2012.]
11/27/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
11/27/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Initial comment: Provide the dimensions of the new roof scupper. Reference: Sections 1106 and 1108.3, IPC 2012.]
2. Comment not addressed. [Initial comment: Provide secondary (overflow) roof drainage or provide structural calculations to show that the roof is capable of supporting the additional rain load. Reference: Sections 1106 and 1107.]
11/28/2018 AVAUGHN1 ZONING REVIEW Needs Review