Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM07663
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/01/2018 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 10/11/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G-2; Occupancy Group; Parking Analysis: Under the occupancy group, the tenant square footage is listed as 31,638 (B) + 10,816 (S-1) for a total square footage of 42,454. Under the parking analysis, a second floor square footage of 9222 is added. Should this second floor square footage be added to the total shown in the occupancy group, and should the occupant load be revised? Please verify. 2. Sheet S-1; Detail 8: Please add a note to reference Detail 9/S-1 for the bolted connection of the new column to the existing concrete panel. 3. Sheet S-2 (Tilt Panel Plan 1); Structural Calculations (Sheet 3): A calculation for the new doorway in the existing tilt-up panel indicates reinforcing in the panel, but no new steel columns as indicated on the plan. Please verify the design of the columns. 4. Sheet S-2; Detail 8: The base plate note indicates four anchors, while the detail shows only 3. Please verify. 5. Sheet S-3; Detail 5: The section cut on this detail references 4/S-1. Please revise that detail reference. 6. Sheet A-3; Roof Plan 2: Please add to Keyed Note 1 to reference structural for additional framing. 7. Sheet A-4; Exterior Canopy Elevation 7: Is this canopy indicated on a plan? Please verify. In addition, provide structural calculations for the canopy framing and foundation. 8. Sheet A-6; Elevations 2 and 3: Please locate the horizontal grab bar on the back wall per the ICC/ANSI Figure 604.5.2. 9. General: Please provide a Special Inspection Certificate with Parts A and B completed. 10. General: Please provide written responses to all review comments. Review by Eric Newcomb Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov |
| 10/15/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the sizes of the condensate drainpipes shown on sheet P-1.2. Reference: Section 307.2.2, IPC 2012. 2. Clarify the supply duct design for HP-B. Reference: Section 107.2.1, IBC 2012. 3. Provide energy code compliance calculations for the addition to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012. 4. Coordinate the load calculations for HP-A and HP-B with the scheduled capacities. (Note that the load calculations for HP-A describe the unit as a split system rather than a packaged unit.) Reference: Section C403.2.2, IECC 2012. |
| 10/15/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the nature of the proposed water closets; the plumbing schedule calls out floor-mounted fixtures but the architectural elevations show wall-mounted fixtures. Reference: Section 107.2.1, IBC 2012. 2. Provide the dimensions of the new roof scupper. Reference: Sections 1106 and 1108.3, IPC 2012. 3. Provide secondary (overflow) roof drainage or provide structural calculations to show that the roof is capable of supporting the additional rain load. Reference: Sections 1106 and 1107. 4. Verify that the new addition will not require the relocation of the existing roof drain terminations. Reference: Section 107.2.1, IBC 2012. |
| 10/15/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 10/23/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Verify that there is lighting in the Electrical rooms. #2. The one line diagrams show all the transformers identified as 'T1'. Please revise. Ref; 2011 NEC 110.26D, 2012 IBC sec 107.2.1 |
| 10/24/2018 | EHAMBLI1 | ZONING | REVIEW | Reqs Change | FROM: Elisa Hamblin, AICP Lead Planner PDSD Zoning Review Section PROJECT: T18CM07663 - TI for Office/Warehouse Building Plans (1st Review), Modular Mining Tenant 3289 E Hemisphere Loop TRANSMITTAL DATE: October 24, 2018 DUE DATE: October 24, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. The tenant improvement proposes an expansion of the building area at the lobby at the east side. This constitutes an expansion of use and requires an updated development package (DP). An approved development package (DP) is needed for comparison at the time of the building plan review by zoning. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include a copy of the revised and approved DP (with PDSD stamp) with the next building submittal.) The PDSD approved and signed copy of the DP shall not be incorporated into the building plans unless it is a PDSD approved and stamped copy. 3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the plans have been reviewed and approved by the Commercial Plan Reviewers and zoning has verified consistency with the PDSD approved and signed copy of the DP, the building plans can be approved by zoning. 5. COMMENT: The required DP could be potentially handled as an over-the-counter review. Please contact me if you wish to proceed in this manner. If you have any questions please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building plans and approved version of the DP as reference. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/26/2018 | AVAUGHN1 | APPROVAL SHELF | Completed |
| 11/26/2018 | AVAUGHN1 | OUT TO CUSTOMER | Completed |
| 11/26/2018 | KROBLES1 | REJECT SHELF | Completed |