Permit Number: T18CM07123
Parcel: 13824083A

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T18CM07123
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/29/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The revised keynotes still call for copper pipe. [Initial comment: Clarify the material to be used for water distribution: copper or CPVC? Reference: Section 107.2.1, IBC 2012.]
2. Comment not addressed. [Second comment: Specify the insulation for the hot water distribution pipe.] [Initial comment: If the proposed service hot water piping is running under the slab, state how it is to be insulated. Reference: Section C404.5, IECC 2012.
07/30/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A.2; Floor Plan: A diagonal line in the building indicates "192 LF Travel Distance to Exit Fire Sprinkler Structure". The IBC Section 1007.1.1 indicates exits must be placed a distance apart not less than 1/2 of the length of the maximum diagonal dimension of the building. Please indicate the building exits on the Floor Plan, and verify they meet that code requirement.
2. Provide a completed Special Inspection Form , signed and dated . IBC 107.1.1.
08/14/2019 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T18CM7123 - New Building (Industrial / General Manufacturing)
Building Plan Review (3rd Review) S&R Cabinetry Builders
6721 S Renaissance Drive - 1-1 Zoning - Related to DP19-0051

TRANSMITTAL DATE: August 14, 2019

DUE DATE: August 23, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has done a review of the building plans and a comparison for consistency with the current version of the unapproved Development Package DP19-0051. Zoning has verified that the building plans are consistent with the current version of the unapproved DP and as it relates to the zoning review purview. However zoning cannot approve the building plans at this time until the DP is approved and the PDSD Commercial Plans Reviewers have approved the building plans..

2. COMMENT: Zoning will review the building plans on the next submittal to assure consistency with the approved DP. If any changes are necessary to the building plans due to plan review comments that affect zoning requirements the DP will have to be revised to reflect the changes. Once the DP is approved by all reviewers and the building plans are approved by the Commercial Plans reviewers zoning can approve the building plans.

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans
08/16/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Clarification requested per the previous plan review was not addressed completely. Ref; Plan Sheet E3.
(a) The site plan shows the location of the service equipment and the line diagram shows the electrical service, a transformer and 4 load centers downstream. Please show the location of this equipment on the site plan, or provide floorplans for each building showing the location of the transformer and panels.
(b) There is a note at the service grounding system that states," REFER TO POWER PLAN". Please clarify and also provide for a complete grounding electrode system per NEC art. 250.
Ref; 2018 IBC sec 107.2.1, 2017 NEC.
08/23/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change The DP must be approved first.