Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T18CM05869
Parcel: 14052051C

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T18CM05869
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/07/2018 MARTIN BROWN FIRE REVIEW Approved
08/13/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
2. Show the source of tempered water for the lavatory, L-1. Reference: Sections 416.5 and 607.1.2, IPC 2012.
3. Civil drawing C-4 calls for 6" cleanouts for the 3" building sewer. Reference: Section 708.7, IPC 2012.
4. Clarify how the floor cleanout in the water quality room (see detail C/H-4) functions. Reference: Section 107.2.1, IBC 2012.
5. Revise the size of the combination drain and vent pipe to correspond to the requirements of Section 915.2.3, IPC 2012 (see Table 906.2, IPC 2012).
08/14/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the energy code analysis for the electrical and water-quality building envelope, coordinating the building components used in the analysis with those shown on the drawing (i.e. the walls and roof descriptions do not match the descriptions used in COMcheck). Reference: Section C303.1, IECC 2012, as amended by the City of Tucson.
2. Detail D/A-9 shows continuous insulation above the roof and no cavity insulation. In addition, the attic space is ventilated which obviates the usefulness of the continuous insulation. Reference: Section C303.2, IECC 2012.
3. Provide heating and cooling load calculations for the electrical and water-quality building, using the exterior design conditions shown in Section 302.2, IECC 2012, as modified by the City of Tucson.
4. Revise the mechanical COMcheck analysis using the HVAC equipment specified on the drawings. Reference: Section 107.2.1, IBC 2012.
08/14/2018 ROBERT SHERRY WATER REVIEW Reqs Change Provide a reduced pressure backflow prevention assembly to separate the water quality building from the municipal water distribution system.
08/14/2018 GPERU1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. Doors serving a Group H occupancy shall not be provided with a latch or lock unless it is panic or fire resistive hardware; provide a description of the doors in the chemical storage facility and specify panic or fire exit hardware. IBC 1008.1.10.
2. Provide specifications for the architectural screen that is inidicated on the exterior walls of the chemical building. Specify material type and verification of conformance to IBC 3102.3 for use in Type IIB construction and NFPA 701.
3. I.B.C. Table 2902.1 requires a Hi/Low drinking fountain for Group F occupancies.
4. The engineer of record shall specify one or more approved special inspectors to perform inspections during construction on the work described in the construction documents. Provide Special Inspector Designation forms for all required special inspections. IBC 1704.2
08/23/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Provide complete compliance with the 2012 IECC for lighting.
#2. Please see the plumbing review comment for restroom lavatory water temperature. An electric hot water heater may have to be provided.
Ref: 2012 IBC, 2011 NEC 2012, 2012 IPC, 2012 IECC

Final Status

Task End Date Reviewer's Name Type of Review Description
08/28/2018 QJONES1 APPROVAL SHELF Completed
08/28/2018 QJONES1 OUT TO CUSTOMER Completed
08/28/2018 QJONES1 REJECT SHELF Completed