Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T18CM04277
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/13/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/18/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Specify method of attachment for interior walls and partitions to floor slab and roof. Provide anchorage details. IBC 107.2.1 2. Provide manufacturers specifications on walk-in cooler and attachement to floor slab. IBC 107.2.1 |
06/19/2018 | GPERU1 | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and load calculations for verfying the capacities of the heating and cooling equipment for this project. Include energy recovery systems that are incorporated into the HVAC system. C302.2, 403.2.1, 403.2.2, IECC 2012, 312.1 IMC 2012 2. Specify the size of the roof access opening and provide details of removable sliding panels. IMC 306.5 3. Where mechanical equipment or appliances are mounted on a roof that require personel to climb higher than 16 ft. to access such equipment, an interior means shall be provided or permanent ladder shall be installed. Specify roof access and provide installation details. IMC 306.5 |
06/20/2018 | GPERU1 | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show the route and termination of the safety pan drain from the water heater. Reference: Section 504, IPC 2012. 2. Water-heating equipment and water heating tanks shall meet the requirements of Table C404.2. Provide specifications from the appliance manufacturer for verification of efficiency requirements. IECC C404.2 3. Provide heat trap specifications if not integral to the water-heating appliance. IECC C404.4. |
06/20/2018 | GPERU1 | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide compliance with the Tucson/Pima County Outdoor Lighting Code. If claiming exemption per section 401.2.1(3), verify full cut-off shielding. 2. Verify that the light source color temperature does not exceed 3500K for the under canopy lighting. Section 402.1, Tucson/Pima County Outdoor Lighting Code. 3. Provide a note on the plans that a Special Inspection will be required when the lumen per acre exceed 100,000 or 75% of the allowable lumens per Table 401.1 of the 2012 City of Tucson/Pima County Outdoor Lighting Code.43. 4. The light pole base required structural calculations and design by a structural engineer. |
07/02/2018 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the civil drawings that show the location and size of the proposed water meter and backflow prevention assembly. |
07/09/2018 | EHAMBLI1 | ZONING | REVIEW | Reqs Change | FROM: Elisa Hamblin, AICP Lead Planner PDSD Zoning Review Section PROJECT: T18CM04277 - New coffee shop Building Plans (1st Review) Dutch Brothers 1971 W Valencia Rd, C-1 Zoning TRANSMITTAL DATE: July 9, 2018 DUE DATE: July 10, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. The development package has been returned for corrections. An approved development package (DP) is needed for comparison at the time of the building plan review by zoning. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. (Include a copy of the most current or the approved and PDSD stamped version of the DP with the next building submittal.) The PDSD approved and signed copy of the DP shall not be incorporated into the building plans unless it is a PDSD approved and stamped copy. 3. COMMENT: If any changes are necessary, due to the PDSD Commercial Plan Reviewer's comments that affect or change the building footprint, height, or square footage, the DP will need to be updated prior to approval of the building plans by Zoning. 4. COMMENT: Once the plans have been reviewed and approved by the Commercial Plan Reviewers and zoning has verified consistency with the PDSD approved and signed copy of the DP, the building plans can be approved by zoning. If you have any questions please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Building plans and current or approved version of the DP as reference. |
07/11/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Needs Review | DP must be approved first. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/16/2018 | SVALENZ1 | OUT TO CUSTOMER | Completed |