Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T18CM03525
Parcel: 117120860

Address:
20 E CONGRESS ST

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T18CM03525
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/10/2018 GPERU1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. Specify stairs as existing for the exit door from the office. Indicate where stairs terminate for the office exit access.
2. The decorative stairs on keynote #6 lead to a window location; specify of part of the exit access.
3. Specify where existing restroom facilities are located; they must be under the tenant occupant or common use.
4. Specity where drinking fountain is located.
5. Accessibility is required if the office space is used for the provision of goods or services.
6. Indicate the floor level of the tenant improvement and the uses of the adjacent spaces.
7. Provide details of the guard rail at the roof mechanical unit; elevations, height and attachment of the rail to the roof deck.
8. Indicate if there are changes to the structural sheet that was approved.
07/10/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Designate a circuit and panel designation for the HP-P1 mechanical unit on the roof. Update load calcs accordingly . NEC 408.4.
07/10/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide cooling/heating load calculations for the new AC unit.
2. The condensate for the new AC unit terminates over an existing roof drain; where does the roof drain terminate?
3. Provide a detail of the proposed guard rail to show that the gaurd rail complies with the requirements of Section 304.11, IMC 2012.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/16/2018 KROBLES1 OUT TO CUSTOMER Completed