Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T18CM02106
Parcel: 14043013B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T18CM02106
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/10/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Previous Comments 5 and 7 were not corrected as required.
05/10/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change A hole in the collector box does not qualify as a secondary roof drain. Section 1108.2, IPC 2012 requires a secondary roof drain to provide a flow rate equivalent to the primary roof drain even if the primary drain is completely blocked. In addition, a secondary drain requires a separate point of discharge from the primary roof drain. [Initial comment: Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.]
05/11/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
05/11/2018 QJONES1 APPROVAL SHELF Completed
05/11/2018 QJONES1 OUT TO CUSTOMER Completed
05/11/2018 QJONES1 REJECT SHELF Completed