Permit Number: T18CM02106
Parcel: 14043013B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T18CM02106
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/12/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The water heater detail shows a shutoff valve between the thermal expansion tank and the cold-water piping. Verify that this complies with the manufacturer's installation instructions. Reference: Section 303.2, IPC 2012.
2. Provide tempered water for the public restroom lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. Note: The minimum hot water inlet temperature is generally 120 degrees Fahrenheit: consult the manufacturer's installation instructions.
3. Verify that the specified sensor faucet for the public lavatories has an automatic time-out so that it will dispense a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
4. The minimum slope for a 4" building sewer is 1/8" per foot (approximately 1%). See sheet C1.1. Reference: Section 704.1, IPC 2012.
5. Show the location of the required cleanouts in the building sewer. Reference: Section 708.3, IPC 2012.
6. Clarify how the service sink, S-1, is being vented. Reference: Section 901.2.1, IPC 2012.
7. Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.
04/12/2018 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the energy code calculations for the additions to the building envelope. Include the entire addition (on sheet A0.0 the gross area of the building is 416 square feet) and coordinate the descriptions of the walls and roof with the construction descriptions on sheets A1.1 and A3.1. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.
2. The mechanical drawings do not indicate the installation of a new heat pump. To what is the mechanical compliance certificate referring? Reference: Section 107.2.1, IBC 2012.
04/12/2018 ROBERT SHERRY WATER REVIEW Completed
04/17/2018 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
04/18/2018 DAVID RIVERA ZONING REVIEW Approved
04/25/2018 JOHN VAN WINKLE ENGINEERING REVIEW Passed
05/02/2018 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1.1; Install Plan 1: Keynote 5 indicates a new 3'W x 7'H wall opening. The plan indicates a 3'-4" wide opening. Please coordinate.
2. Sheet A1.1; Install Plan 1; Ceiling Plan 3: Keynote 10 indicates a metal access panel (shown on Plans 1 and 3). Does this access panel extend through the roof (not shown)? Please verify.
3. Sheet A1.1; Wall Types A1, A2, and A3: The IBC Section 1607.14 requires interior walls and partitions that exceed 6' in height shall have adequate strength to resist a minimum 5 PSF horizontal load. Please provide a detail on the drawings indicating diagonal bracing from the top of the wall to the roof structure above. Include the bracing size and spacing along with the number and size of connectors of the bracing to the top of the wall and to the roof structure above.
4. Sheet A3.1; North Elevation 1: A section cut indicates A/A3.1. Should this be 3/A3.1? Please verify.
5. Sheet A4.1; Enlarged Floor Plan: In the Breakroom, the elevation indicator references 3. Please revise that reference.
6. Sheet A4.1; Enlarged Floor Plan: In the Janitor Room, the elevation indicator references 4. Please revise that reference.
7. Sheet A4.1; Typical Mounting Heights: The 36" rear wall grab bar is not located from the centerline of the water closet. Please revise the elevation per the ICC/ANSI Figure 604.5.2.
8. Sheet S1.1 (Keynote 2); Sheet S3.0 (Detail 4): The detail indicates 2-#4 continuous (UNO) in the footing, while the keynote indicates 2-#5 continuous. Please revise the detail note to coordinate with the keynote.
9. Sheet S3.0; Detail 4: A note indicates to see Detail 8 for additional wall information. Detail 8 was not used. Please revise.
10. General: Please provide written responses to all review comments.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/10/2018 QJONES1 APPROVAL SHELF Completed
05/10/2018 QJONES1 OUT TO CUSTOMER Completed
05/10/2018 QJONES1 REJECT SHELF Completed