Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T18CM01161
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/14/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/14/2018 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/14/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
02/14/2018 | JPEELDA1 | FIRE | REVIEW | Approved | |
02/15/2018 | ALEXANDRA HINES | ZONING | REVIEW | Reqs Change | P&DS TRANSMITTAL FROM: Alexandra Hines, Lead Planner PROJECT: T18CM01161 TRANSMITTAL: February 15, 2018 COMMENTS: the following comments are relative to an application for Historic Review (UDC 5.12.7). This site is located in the Rio Nuevo Area to obtain review of the proposed walkway, ramp, and stair on the south and north sides of the building. |
02/15/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
02/15/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet a101; Floor Plan: At the new exterior ramp, architect must determine if a handrail is required (Reference the IBC Section 1010). If required, please provide details on the drawing of that rail. 2. Sheet a101; Wall Section a-01: Please provide Table A per a wall note, or include the required information with the existing note. 3. Sheet a103; Roof Plan: Please verify the existing roof structure will safely support the new mechanical units and the addition of the new 2" rigid insulation. 4. General: Please provide written responses to all review comments. |
02/15/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
02/15/2018 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |