Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search
Parcel Attributes
Parcel117160130
JurisdictionTucson
City of Tucson ZoningI-1
Tucson WardWard 6
Tucson Downtown Incentive ZoneDowntown Core, Downtown Infill Incentive District
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodDowntown
RedevelopmentDowntown Redevelopment District
National Register Historic District

Warehouse Historic District

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 35 E TOOLE AV
Date - 05/15/2024 9:23 p.m.
Total Number Of Historic Records Requests - (3)
Name Action
Address: 35 E TOOLE AV - Doc Type: CERT OF OCC VIEW
Address: 35 E TOOLE AV - Doc Type: CERT OF OCC VIEW
Address: 35 E TOOLE AV - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 35 E TOOLE AV
Date - 05/15/2024 9:23 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Rezoning Cases

Date - 05/15/2024 9:23 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-11-05 Downtown Links UOD UOD Closed 03/23/2011

Special Development Requests & Requirements

Address: 35 E TOOLE AV
Date - 05/15/2024 9:23 p.m.
Total Number Of Special Development Permits - (5)
Activity Number Status Apply Date Expired Date Unit Type Description
H000003548 CLOSED 04/04/2011 N/A Historical Information
T11SA00318 CLOSED 08/15/2011 N/A Historic Preservation Zone RND-11-06 FENTON OPENED UP WINDOWS ON EAST ELEVATION
T11SA00377 CLOSED 10/04/2011 N/A Historic Preservation Zone RND-11-10 BLX: SIGN INSTALL 3 SIGNS - PAINTED ON WALL FACADE
T18SA00103 APPROVED 03/07/2018 04/20/2019 Design Review Board DRB approved with no conditions. ADA issues to be addressed during build review.
T18SA00170 COMPLETE 04/24/2018 05/17/2019 IID RNA Subarea HPZ-19-93 HPZ-18-28/RNA/DRB-18-02 Raise front walkway, add ADA ramp, restore historic window openings, new windows and doors

Permits

Address: 35 E TOOLE AV
Date - 05/15/2024 9:23 p.m.
Total Number Of Permits - (29)
Permit Status Apply Date Expired Date Unit Type Description
T05AN00893 ISSUED 08/17/2005 N/A ADDRNEW
T05CM02097 FINAL 05/10/2005 02/26/2006 COMBO SVEIAI REMEDIAL SYSTEM DESIGN
T06CM02443 WITHDRWN 04/25/2006 N/A COMBO TI: WAREHOUSE
T08CM03764 WITHDRWN 11/24/2008 N/A COMBO TI: SKRAPPY'S
T08OT01825 WITHDRWN 07/31/2008 N/A C-OF-O C OF O: SKRAPPY'S /OUR FAMILY SOCIAL SERVICES (ART CENTER)
T08OT02798 WITHDRWN 11/25/2008 N/A FLOODPLN FLOODPLAIN USE PERMIT
T10CM02368 C OF O 08/26/2010 07/04/2011 COMBO ART STUDIOS & GALLERIES
T10OT01844 WITHDRWN 08/26/2010 N/A C-OF-O C OF O: OFFICE
T11BU01193 FINAL 09/19/2011 06/06/2012 BUILD WINDOW RESTORATION
T11OT01598 EXPIRED 08/15/2011 04/01/2012 SIGN 19848 3 painted wall signs - historic building requires review from HPZ - case T11SA00377
T12ME00030 VOID 05/02/2012 N/A *2M MECH Install two (2) Air Conditioning units and distribution systems
T15EX01889 FINAL 06/24/2015 12/17/2016 EXCAV THIS WORK IS REQUIRED PER THE CITY OF TUCSON REQUESTS FOR CENTURYLINK TO RELOCATE AERIAL AND STRUCTURAL FACILITIES IN CONFLICT WITH THE CITY OF TUCSON DOWN TOWN LINKS PHASE III ROAD IMPROVEMENT 6TH STREET UNDERPASS TO BROADWAY BLVD. JOB #S30N PLAN #1-2013-018. CENTURYLINK IS IN ROAD RIGHT OF WAY BY PERMIT. CENTURYLINK RIGHT OF WAY RESEARCH PROVIDED NO PRIOR RIGHTS DOCUMATION FOR REENBURSMENTS RELATED TO CENTURYLINKS RELOCATION COSTS. FACILITIES TO BE RELOCATED ARE SERVICE AFFECTING (INNER OFFICE FIBER SERVICE FACILITIES, FACILITY 1 COPPPER FEEDER SERVICE FACILITIES, FACILITY 2 COPPER DISTRUBTION SERVICE FACILITIES). CITY OF TUCSON IS SLATED TO BEGIN CONSTRUCTION FRIST QUARTER 2016. CENTURYLINK IS SLATED TO BEGIN CONSTRUCTION 2ND QUARTER 2015.THIS WORK WILL TAKE PLACE .987 KF FROM THE TUCSON MAIN CENTRAL OFFICE ROUTE #1. Work Type: City of Tucson Capital Improvement Project; Curb Cut; Driveway Apron; HCS/Private Sewer; Manhole Adjustment; New Manhole; New Sidewalk; New Vertical Curbing; Pole Placement or Replacement; Pot Hole; Sidewalk or Driveway Repair; Trench; Utility Bore or Bore; Utility Cabinet Install. ADDRESS ON APPLICATION INDICATED: 300 N. 7TH AVE; CIP #: Job #s30N PLAN #1-2013-018 WORK ORDER # E.738598 PLEASE CONTACT PARK TUCSON AT 520-791-5071; THIS IS A PERMIT AREA.
T15TC01544 FINAL 06/24/2015 N/A BARRICAD WHY: THIS WORK IS REQUIRED PER THE CITY OF TUCSON REQUESTS FOR CENTURYLINK TO RELOCATE AERIAL AND STRUCTURAL FACILITIES IN CONFLICT WITH THE CITY OF TUCSON DOWN TOWN LINKS PHASE III ROAD IMPROVEMENT 6TH STREET UNDERPASS TO BROADWAY BLVD. JOB #S30N PLAN #1-2013-018. CENTURYLINK IS IN ROAD RIGHT OF WAY BY PERMIT. CENTURYLINK RIGHT OF WAY RESEARCH PROVIDED NO PRIOR RIGHTS DOCUMATION FOR REENBURSMENTS RELATED TO CENTURYLINKS RELOCATION COSTS. FACILITIES TO BE RELOCATED ARE SERVICE AFFECTING (INNER OFFICE FIBER SERVICE FACILITIES, FACILITY 1 COPPPER FEEDER SERVICE FACILITIES, FACILITY 2 COPPER DISTRUBTION SERVICE FACILITIES). CITY OF TUCSON IS SLATED TO BEGIN CONSTRUCTION FRIST QUARTER 2016. CENTURYLINK IS SLATED TO BEGIN CONSTRUCTION 2ND QUARTER 2015.THIS WORK WILL TAKE PLACE .987 KF FROM THE TUCSON MAIN CENTRAL OFFICE ROUTE #1. Work Type: City of Tucson Capital Improvement Project; Curb Cut; Driveway Apron; HCS/Private Sewer; Manhole Adjustment; New Manhole; New Sidewalk; New Vertical Curbing; Pole Placement or Replacement; Pot Hole; Sidewalk or Driveway Repair; Trench; Utility Bore or Bore; Utility Cabinet Install CIP #: Job #s30N PLAN #1-2013-018
T15TC02700 FINAL 12/08/2015 N/A BARRICAD INSTALL IN EXISTING CONDUIT-FIBER OPTIC CABLE-SHADOW TRUCK -IN SOUTH BOUND ROUTE DIRECTION FOR WESTSIDE OF STREET CLOSURE-HOURS OF OPERATION-PARK AV: 9AM-3:30PM/EUCLID AV: ANY TIME/NOGALES HWY:9AM-3:30PM
T18BU00410 WITHDRWN 07/11/2018 06/16/2019 DEMO INTERIOR DEMO ONLY
T18CM01161 FINAL 02/14/2018 06/07/2021 COMBO INTERIOR DEMO AND SHELL IMPROVEMENT DRB PROCESS UNDERWAY
T18CM06408 C OF O 08/15/2018 08/01/2021 COMBO TI: INTERIOR TO RESTAURANT (PREVIOUSLY OFFICE)
T19FC00509 FINAL 07/01/2019 04/14/2021 FIRECONS New Fire Sprinkler System
T19RW05284 FINAL 09/16/2019 11/06/2019 ROW SEWER TAP 30' IN ASPHALT PERPENDICULAR TO STREET. PROJECT DURATION ANTICIPATED 2-3 DAYS WITHIN A 2 WEEK WINDOW. TRAFFIC CONTROL FIELD ADJUSTMENTS WILL BE MADE. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION.
T19RW06167 FINAL 10/16/2019 12/27/2019 ROW REPLACING POLE.
T20FC00350 FINAL 05/20/2020 06/07/2021 FIRECONS MONITOR SPRINKLER RISER
T20FC00804 FINAL 11/27/2020 12/09/2021 FIRECONS Install new Hood System
T20RW01686 FINAL 03/16/2020 08/07/2020 ROW SWG TOOLE RESTAURANT DEVELOPENT CREWS WILL BE WORKING ON 7TH AVE AND THE INTERSECTION OF TOOLE AVE TO REPLACE GAS MAIN FOR NEW COMMERCIAL DEVELOPMENT @ 25 LF IN ASPHALT THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. STOP WORK AND NOTIFY HPO IF ANY BURIED CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION.
T20RW01963 FINAL 04/02/2020 05/16/2020 ROW REMOVE CURB AND ACCESS RAMP AND POUR BACK AT SIDEWALK LEVEL
T20RW02429 FINAL 04/29/2020 06/29/2020 ROW Starting on the South side of E. Tool Ave at TEP pole, Overlash going N/E for 193' NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, AT:520-791-5071 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions.
T97CM01182 C OF O 05/08/1997 02/20/1999 COMBO TENANT IMPROVEMENT:OFFICE ONE STORY WITH BASEMENT
T98BU00412 FINAL 02/17/1998 09/27/1998 SPKLR FIRE SPKR:NEW 15
T98PL02123 FINAL 11/03/1998 05/11/1999 PLUMB GAS LINE:PRESSURE TEST
TUC-22865 RENEWAL 11/21/1997 06/01/1999 VESSEL