Permit Review Detail
Review Status: Active
Review Details: REVISION - - 3RD
Permit Number - T17CM08215
Review Name: REVISION - - 3RD
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/25/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 03/25/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 03/26/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The roof drainage design has significantly changed compared to the approved plans both in placement of the roof drains and the number of roof drains. It is not clear from sheets P1.1 and P2.3 how the roof drains connect to the termination locations or the noted roof drain sizes. Provide calculations and clarification of the drawings. See markups on the submitted drawings. |