Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM06552
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/25/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
08/25/2017 | ERIC NEWCOMB | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
08/25/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide branch circuit and panel designations for the new lighting and receptacles. Locate the electrical panel on the floorplan. Provide a complete panel schedule. Provide a luminaire schedule or cut sheet for the lighting. REf; 2012 IBC 107.2.1. 2011 NEC. |
08/25/2017 | ACONNOR1 | ENGINEERING | REVIEW | Passed | |
08/25/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0; Floor Plan 5: At the new stud wall note, please indicate the stud size and spacing. In addition, indicate the top of the wall bracing as required. 2. Sheet A1.0; Section 3: The new metal awning (by owner) must include details of how the awning attaches to the walls. Please provide. 3. Sheet A1.0; Section 3: A note indicates to see structural for the new storefront entry. No information or details were located. Please verify. |
08/25/2017 | ENEWCOM1 | WATER | REVIEW | Passed | |
08/25/2017 | ERIC NEWCOMB | PLUMBING-COMMERCIAL | REVIEW | Passed | |
08/25/2017 | JVINCEN1 | FIRE | REVIEW | Approved | |
08/25/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/25/2017 | ENEWCOM1 | WWM | REVIEW | Passed |