Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 117120310
Parcel Search
Parcel Attributes
Parcel | 117120310 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | OCR-2 |
Tucson Ward | Ward 6 |
Tucson Downtown Incentive Zone | Downtown Core, Downtown Infill Incentive District |
Rio Nuevo Downtown | Rio Nuevo - Downtown |
Rio Nuevo Multipurpose Facilities District | Yes |
Tucson Registered Neighborhood | Downtown |
Major Streets & Routes | Gateway Route |
Redevelopment | Downtown Redevelopment District |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Addresses |
Annexations & Original City Zoning (OCZ)
Date - 11/14/2024 11:49 p.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
Original Town Of Tucson | ORIGINAL | 08/07/1877 | None |
Special Development Requests & Requirements
Date - 11/14/2024 11:49 p.m.
Total Number Of Special Development Permits - (6)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000000239 | Closed | N/A | |||
T05SA00189 | Approved | N/A | THE APPLICANT IS REQUESTING REVIEW OF TEH PROPOSED FACADE MODIFICATION FOR COMPATIBILITY WITH RIO NUEVO AND DOWNTOWN ZONE DESIGN CRITERIA. | ||
T05SA00301 | Approved | N/A | THE APPLICANT IS REQUESTING REVIEW OF THE PROPOSED FACADE MODIFICATION ART FOR COMPATIBILITY WITH RIO NUEVO AND DOWNTOWN ZONE DESIGN CRITERIA. 4/15/05 DRB RECOMMENDS CONTINUING THE CASE TO ALLOW APPLICANT TIME TO PROVIDE INFORMATION ON MATERIALS AND FINISHES. 4/29/05 DRB RECOMMENDATION TO THE DEVELOPMENT SERVICES DIRECTOR: APPROVAL. | ||
T17SA00274 | Approved | N/A | DRB hearing on the 1 East Congress building for a new store front. This building is located on the south-east corner of Stone and Congress and has a bluish gray color tone. The applicant is introducing a new location for the Perri Jewelery store. The proposal includes a new store front facing Congress. Non-historic structure Shade study to be submitted. | ||
T18SA00274 | Approved | 08/22/2018 | Project proposes to create a new 5’-6 wide storefront opening on the Stone Ave façade, enabling the now vacant space to become leasable. The new storefront and entry will match the existing storefront and entry doors of the existing building. | ||
T21SA00381 | Complete | N/A | Zoning compliance letter for multi-use |
Permits
Parcel Number - 117120310
Date - 11/14/2024 11:49 p.m.
Total Number Of Permits - (75)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-0324-00642 | Needs resubmittal | 03/27/2024 | N/A | UNIT 201 | Right-of-Way (ROW) - Utility | 2 E Congress Street - Access to Manhole #1 for State Attorney General Audit - west side of the building 140 feet from CL of Congress Street |
TR-UTL-0424-00844 | Complete | 04/23/2024 | 05/31/2024 | UNIT 201 | Right-of-Way (ROW) - Utility | Access MH#1 for State Attorney General Audit |
TR-UTL-0424-00847 | Complete | 04/23/2024 | 05/31/2024 | UNIT 201 | Right-of-Way (ROW) - Utility | Need access to the manhole for the State Attorney General Audit |
TC-COM-0423-01158 | Withdrawn | 04/27/2023 | 10/24/2023 | Commercial Building | CONSTRUCT A NEW RETAIL BANK IN AN EXISTING INTERIOR SPACE. INSTALL NEW EXTERIOR WALK-UP ATM AND AFTER-HOUR DEPOSIT BOX. | |
TC-COM-0423-01161 | Void | 04/27/2023 | 10/24/2023 | Commercial Building | Void-VF-Duplicate permit. Please submit under TC-COM-0423-01158 CONSTRUCT A NEW RETAIL BANK IN AN EXISTING INTERIOR SPACE. INSTALL NEW EXTERIOR WALK-UP ATM AND AFTER-HOUR DEPOSIT BOX. | |
TR-ROW-0723-00924 | Complete | 07/04/2023 | 10/16/2023 | Right-of-Way (ROW) | Street closures for the 50th annual Tucson Meet Yourself festival. Tues 10/10: set-up 6pm Wed 10/11: set-up 6pm Fri 10/13: set-up 6pm Sun 10/15: take-down 11:30pm | |
T20FC00543 | Expired | 08/18/2020 | 09/04/2021 | Fire Construction Permit | Fire Alarm & Detection Systems - INSTALL A CELLULAR TRANSMITTER TO MONITOR THE EXISTING FIRE ALARM PANEL.; Fire Alarm Systems - Monitor Only | |
T19RW06027 | Expired | 10/11/2019 | 01/18/2020 | Right-of-Way (ROW) | CONNECTING POWER TO SEASONAL LIGHTING ON TREES ALONG BROADWAY AND CONGRESS USING A BUCKET TRUCK AND; Work Order: EMAIL | |
T22RW03768 | Submitted | 10/16/2022 | N/A | Right-of-Way (ROW) | CONNECTING POWER TO SEASONAL LIGHTING ON TREES ALONG BROADWAY AND CONGRESS USING A BUCKET TRUCK AND; Work Order: EMAIL | |
T00CM03122 | Closed | 06/22/2000 | 12/23/2000 | COMBO | DEMOLITION OF NON-BEARING INTERIOR AND STOREFRONT PIMA CO DEQ PERMIT #5773 | |
T00CM03596 | Final | 07/19/2000 | 04/30/2001 | COMBO | TI:DEMO NON-BEARING INTERIOR | |
T00CM03710 | Closed | 07/27/2000 | 05/21/2001 | COMBO | TI:SHELL BUILDING/EXTERIOR & ELECTRICAL | |
T00CM04091 | Withdrwn | 08/17/2000 | N/A | COMBO | TI:OFFICE | |
T01AN01002 | Issued | 10/19/2001 | N/A | #201 | ADDRNEW | |
T01BU03439 | Final | 12/07/2001 | 09/18/2002 | SPKLR | SPRINKLER:279 NEW | |
T01BU03581 | Final | 12/31/2001 | 10/13/2002 | SPKLR | FIRE SPKR:ADD 22 | |
T01CM04733 | Closed | 09/20/2001 | 10/02/2002 | COMBO | SHELL REVISION ONLY-NO C OF O. | |
T01CM05253 | C of o | 10/19/2001 | 10/14/2002 | #201 | COMBO | TI:OFFICE/TELECOMMUNICATIONS SUITE 201 |
T02CM05411 | Final | 11/21/2002 | 10/12/2003 | COMBO | REMODEL:WINDOWS & DOORS | |
T02CM05809 | Withdrwn | 12/18/2002 | N/A | COMBO | SHELL REVISION | |
T02EL02344 | Expired | 12/03/2002 | 06/07/2003 | #201 | ELECT | ELECTRIC:1 CIRCUIT FOR ADDRESS NUMERAL |
T02EX00401 | Closed | 04/04/2002 | 06/03/2002 | EXCAV | EXCAV:106 LF UTILITY VAULTS | |
T04BU02297 | Closed | 09/16/2004 | 03/15/2005 | DEMO | DEMO:WALL | |
T05AN00860 | Issued | 08/05/2005 | N/A | #101 | ADDRNEW | |
T05BU01599 | Final | 06/23/2005 | 12/21/2005 | SPKLR | FIRE SPKR: RELOCATE 2 FIRE | |
T05BU02378 | Final | 09/27/2005 | 05/14/2006 | #101 | SPKLR | FIRE SPKR: RELOCATE 40 ADD 4 |
T05CM01325 | Final | 03/23/2005 | 01/24/2006 | COMBO | SHELL IMPROVEMENTS | |
T05CM04128 | C of o | 08/05/2005 | 07/17/2006 | #101 | COMBO | TI: BANK |
T05OT02560 | Final | 10/14/2005 | 08/26/2006 | #101 | SIGN | 9888 |
T05OT02561 | Final | 10/14/2005 | 11/18/2006 | #101 | SIGN | 9889 |
T05OT02916 | Final | 11/23/2005 | 05/22/2006 | #101 | SIGN | 10115 |
T06BU02769 | Final | 11/24/2006 | 07/23/2007 | SPKLR | ADD 33 NEW FIRE SPRINKLERS | |
T06CM04571 | C of o | 08/14/2006 | 10/07/2007 | COMBO | TI: RESTAURANT | |
T07AN00333 | Issued | 04/19/2007 | N/A | ADDRNEW | ||
T07AN00855 | Issued | 10/17/2007 | N/A | #245 | ADDRNEW | |
T07BU00471 | Final | 03/02/2007 | 10/08/2007 | BUILD | KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM | |
T07CM03058 | Withdrwn | 07/19/2007 | N/A | #150 | COMBO | TI:OUTSIDE BAR |
T07CM04090 | Withdrwn | 10/17/2007 | N/A | #245 | COMBO | TI: RESTROOM REMODEL |
T07ME00129 | Withdrwn | 03/02/2007 | N/A | MECH | KITCHEN EXHAUST HOOOD FIRE SUPPRESSION SYSTEM | |
T08AN00267 | Issued | 03/05/2008 | N/A | #165 | ADDRNEW | |
T08BU01325 | Final | 07/22/2008 | 03/22/2009 | #245 | SPKLR | Relocate 38 fire sprinklers |
T08BU01589 | Closed | 08/29/2008 | 08/15/2011 | #150 | BUILD | WALL SCREENING AND FURNITURE FOR RESTAURANT PATIO |
T08BU01614 | Final | 09/05/2008 | 04/13/2009 | #245 | BUILD | NEW EST EQUIPMENT TO EXISTING FIRE ALARM SYSTEM |
T08CM01423 | Closed | 05/02/2008 | 03/03/2009 | #150 | COMBO | TI:RESTAURANT (SUITE 150) |
T08CM02251 | Final | 06/25/2008 | 04/12/2009 | COMBO | TI: 1ST AND 2ND FLOORS | |
T08CM02341 | C of o | 07/02/2008 | 04/21/2009 | #245 | COMBO | TI: OFFICE "EARLY LOCAL CENSUS OFFICE" |
T08OT01835 | Final | 08/01/2008 | 06/17/2009 | #150 | SIGN | 15390 |
T11OT00318 | Expired | 02/16/2011 | 08/15/2011 | #150 | C-OF-O | ZONING CERT ONLY: RESTAURANT |
T12CM01272 | Final | 03/21/2012 | 09/30/2012 | #101 | COMBO | REINFORMENT OF I BEAM - COMM |
T14CM02247 | L of c | 04/21/2014 | 11/01/2014 | #245 | COMBO | TI: OFFICE |
T14CM08029 | Expired | 11/24/2014 | 06/21/2015 | #153 | COMBO | OFFICE |
T14OT01597 | Final | 12/22/2014 | 12/13/2015 | SIGN | (22440) 2- ILLUM WALL SIGNS | |
T15OT00225 | Expired | 02/18/2015 | 08/24/2015 | C-OF-O | C OF O | |
T17CM06552 | L of c | 08/25/2017 | 04/10/2018 | #111 | COMBO | TI: RETAIL |
T17OT01145 | Final | 11/03/2017 | 05/08/2018 | #111 | SIGN | 1- NON ILLUM WALL SIGN |
T17RW00174 | Final | 01/10/2017 | 02/20/2017 | ROW | REMOVE BRICK ALONG BUILDING SIDEWALK APPROX. 2 FT X 2 FT DIG ABOUT 3 FT DOWN TO LOOK AT BELOW GRADE OF BUILDING PLACE BRICK BACK TO ORIGNAL STATE APPROX. TIME FROM START TO FINISH IS 4 HOURS APPROX. 6AM TO 10AM | |
T17RW03234 | Final | 07/28/2017 | 09/04/2017 | ROW | REROUTE PEDESTRIANS WHILE PAINTING BUILDING | |
T17RW04883 | Final | 11/01/2017 | 11/06/2017 | ROW | REMOVAL AND INSTALLATION OF BANNERS ON VARIOUS LIGHT POLES, BUCKET TRUCK AERIAL LIFT CONGRESS AND BROADWAY BETWEEN 4TH AND CHURCH | |
T17RW05059 | Expired | 11/14/2017 | 02/15/2018 | ROW | CONNECTING POWER TO SEASONAL LIGHTING ON TREES ON BROADWAY AND CONGRESS, BETWEEN CHURCH AND TOOLE, USING A BUCKET TRUCK AND LADDERS 11/19: 9P - 6A (Sunday only) 11/20 - 11/22: 11P - 6A (Monday, Tuesday, and Wednesday 01/24/2018-PLAN CHANGE START 01/28/2018 FINISH 01/30/2018 START TIME -SUNDAY NIGHT (9PM) M-T-11PM FINISH TIME-6:00AM | |
T18CM06347 | Final | 08/14/2018 | 07/15/2019 | COMBO | REDIRECRT DRAINAGE | |
T18CM07189 | Expired | 09/11/2018 | 10/16/2019 | COMBO | TI: REMODEL BUILDING ENTRANCE | |
T18RW04652 | Final | 10/16/2018 | 01/19/2019 | ROW | CONNECTING POWER TO SEASONAL LIGHTING ON TREES ALONG BROADWAY AND CONGRESS USING A BUCKET TRUCK AND LADDERS SUNDAY- OCT. 21, 2018 9PM (SUNDAY ONLY) 11PM (MTW) THURSDAY- OCT. 25, 2018 FINISH TIME 6AM | |
T19CM02818 | C of o | 04/19/2019 | 01/30/2021 | #101 | COMBO | DENTAL OFFICE |
T19CM07453 | Final | 10/10/2019 | 01/26/2021 | COMBO | HVAC REPLACEMENT | |
T19FC01018 | Final | 12/02/2019 | 08/03/2020 | FIRECONS | modify existing wet ipe fire sprinkler system | |
T19RW02608 | Final | 05/09/2019 | 06/14/2019 | ROW | INSTALL UNDERGROUND CABLE IN EXISTING DUCT NOTE: ADDRESS ON PERMIT IS 1 E CONGRESS ST, BUT THE WORK IS ON THE NW CORNER OF STONE/BROADWAY NOTE: APPLICANT SHALL COORDINATE WORK WITH EXISTING BUILDING SITE CONTRACTOR | |
T20FC00398 | Final | 06/11/2020 | 01/05/2021 | FIRECONS | Adding two devices | |
T20OT00093 | Final | 01/24/2020 | 09/02/2020 | #101 | SIGN | 1- ILLUM WALL SIGN |
T20OT00372 | Final | 05/14/2020 | 04/11/2022 | SIGN | 1- ILLUM CANOPY SIGN | |
T20RW02252 | Final | 04/17/2020 | 04/27/2020 | ROW | SIDEWALK CLOSURE ON CONGRESS ST AND STONE AV TO SET SCAFFOLDING TO PATCH HOLES AND REPAIR EIFS ON EXTERIOR FACE OF BUILDING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. | |
T20RW04829 | Final | 08/31/2020 | 01/31/2022 | ROW | APPROXIMATELY 156 STREET POLE BANNERS FOR DOWNTOWN REOPENING MARKETING CAMPAIGN IN PARTNERSHIP WITH PIMA COUNTY BACK-TO-BUSINESS INITIATIVE. PLEASE REFER TO MAP FOR STRETCHES OF STREET BANNERS WILL BE INSTALLED AND THE NUMBER OF POLES (BANNERS) ON EACH STRETCH. "WELCOME BACK" "READY FOR YOU" "HOLA - LISTO PARA SERVIR" "CLEAN & SAFE" WITH "DOWNTOWNTUCSON.ORG" AND DTP LOGO TO LEAD PEOPLE TO A LISTING OF OPEN BUSINESSES DOWNTOWN WHO HAVE BEEN CERTIFIED BY THE PC HEALTH DEPT. AS 'READY FOR YOU.' BANNERS TO BE INSTALLED BY DTP ON A SUNDAY/MONDAY EARLY MORNING 4AM-7AM. A SEPARATE TRACK ACCESS APPLICATION WILL BE SUBMITTED TO SUN LINK. POWER DOWN OF STREETCAR OCS LINE WILL BE REQUESTED FOR BANNERS BEING INSTALLED ON CONGRESS AND BROADWAY FOR TIME(S) AFTER THE STREETCAR IS NON-OPERATIONAL. RUSS STONE, MAINTENANCE AND SAFETY SUPERVISOR (520-940-0806) WILL PERFORM INSTALL WITH USE OF DTP BUCKET TRUCK. CITY OF TUCSON NOT RESPONSIBLE FOR REPLACEMENT OF BRACKETS NOR BANNERS MOUNTED ON ANY CITY LIGHT POLES DAMAGED OR REMOVED BY WEATHER OR VEHICLE MAINTAIN BANNERS IN GOOD CONDITION, CHECK AFTER SEVERE WEATHER. REPLACE AS NECESSARY WITH PERMISSION FROM TDOT. SHALL PROVIDE FLAGGERS, KEEP PEDESTRIAN WALKWAYS SAFE, INSTALL DURING NON BUSINESS HOURS AND REPAIR ANY DAMAGE THEY CAUSE. SHALL COORDINATE WITH SUNLINK PRIOR TO STARTNG WORK CONGRESS BETWEEN STONE AND SCOTT (8 BANNERS) | |
T20RW05051 | Final | 09/15/2020 | 02/17/2021 | ROW | CONNECTING POWER TO SEASONAL LIGHTING ON TREES ALONG BROADWAY AND CONGRESS USING A BUCKET TRUCK AND LADDERS HOURS ALONG SUNLINK (CONGRESS, BROADWAY, 4TH AV) START SUNDAY- SEPT. 20, 2020 9:00 P.M. - 11:00 P.M. (MTW) FINISH THURSDAY - SEPT 24, 2020 6:00 A.M. | |
T21RW01355 | Final | 03/23/2021 | 04/02/2021 | ROW | REMOVING POWER FROM SEASONAL LIGHTING ON TREES ALONG BROADWAY AND CONGRESS USING A BUCKET TRUCK AND LADDERS. HOURS ALONG SUNLINK (CONGRESS, BROADWAY, 4TH AV) START MONDAY- MARCH 29, 2021 11:00 P.M. - 6:00 A.M. (MTW) FINISH THURSDAY - APRIL 01, 2021 6:00 A.M. | |
T21RW04424 | Final | 09/27/2021 | 04/01/2022 | ROW | CONNECTING POWER TO SEASONAL LIGHTING ON TREES ALONG BROADWAY AND CONGRESS USING A BUCKET TRUCK AND LADDERS. HOURS ALONG SUNLINK (CONGRESS, BROADWAY, 4TH AV) START MONDAY- OCTOBER 04, 2021 11:00 P.M. - 6:00 A.M. (MTW) FINISH THURSDAY - OCTOBER 07, 2021 6:00 A.M. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. COMMUNICATION WITH INSPECTOR REQUIRED WHEN WORKING OUTSIDE THE DATES LISTED ABOVE. | |
T98CM00417 | Withdrwn | 01/30/1998 | N/A | COMBO | TI:RESTAURANT |
Code Enforcement
Parcel Number - 117120310
Date - 11/14/2024 11:49 p.m.
Total Number Of Code Cases - 4
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T08FR04156 | Complete | 11/04/2008 | N/A | FIREINSP | SPRINKLER INSPECTION | |
T10FR01483 | Complete | 07/27/2010 | N/A | #100 | FIREINSP | Self inspection program |
T16DV08607 | Complian | 12/24/2016 | N/A | DNR_VIOL | section of roof came off, | |
T99VL01541 | Complian | 06/04/1999 | N/A | CODEVIOL | COMPLAINT: TPD CALLOUT FOR BROKEN WINDOW |
Plans
Parcel Number - 117120310
Date - 11/14/2024 11:49 p.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
SD-0523-00050 | Fees paid | 05/10/2023 | N/A | Special Districts | CONSTRUCT A NEW RETAIL BANK IN AN EXISTING INTERIOR SPACE. INSTALL NEW EXTERIOR WALK-UP ATM AND AFTER-HOUR DEPOSIT BOX. |