Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL
Permit Number - T17CM04982
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/11/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Clarify the size and number of water meters planned for the new building. The water calculations on sheet P101indicate two 2" water meters will be used but the plumbing plan and keynote 14 on sheet P201show a 3" water meter. Tucson Water will not allow water meters and backflow preventers to be manifolded to achieve additional capacity. |
| 07/18/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principle Planner PROJECT: RendzVous urban flats T17CM04982 Building Plan (1st Review) TRANSMITTAL DATE: July 18, 2017 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Until development package DP16-0200 is approved Zoning cannot approve the building plans. 3. The development package sheets, C100 - C700, provided in the building plan set either need to be the approved development package sheets, marked as "FOR REFERENCE ONLY", or removed from the building plan set. 4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 07/20/2017 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | The Fire Department has been in contact with the 3rd party reviewer. We have no comments beyond their observations. Once the 3rd party reviewer's comments are addressed, the plans can be approved by the fire department. |
| 07/21/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DP16-0200 must be approved first. |
| 08/01/2017 | GERRY KOZIOL | WWM | REVIEW | Reqs Change | The following is needed for Sewer Connection Fee Application Approval: Need Type III Capacity review RWRDCapacityResponse@pima.gov – 520-724-6642 Need to clarify Water Meter size: Two 2” Water Meters per Drawing P101 One 3” water meter per Drawing P201 |
| 08/02/2017 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 08/02/2017 | ENEWCOM1 | ADA | REVIEW | Passed | |
| 09/22/2017 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/27/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |