Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T17CM04423
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/06/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/06/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide manholes for the proposed building sewer. Reference: Section 708.3.2, IPC 2012. |
06/06/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide sealed and signed electrical plans by an Arizona Electrical Registrant. #2. The electrical plan one-line diagram E1.SA. (a) Shows 2 'temp ses -1'. Do you really want them to have the same nomenclature .Please clarify. (b) The power requirements for the Guard Shack are not shown. (c) Identify the construction trailers on the electrical site plan. (d) Feeder #4 is not shown on the feeder schedule. XXXX ? (e) Provide complete load calcs. (f) The feeder sizes and types do not correlate with the ses amp ratings. 1200 amp rated (ses#1) shows 2-sets of 350 mcm, and the 600 amp (ses#1) shows 3- sets of 600 mcm. (g) The one-line diagram is not complete to the existing PME Switching Cabinet. (h) Provide for a grounding electrode system to be provided at the SES locations as required per NEC art. 250.32. Ref: 2012 IBC sec. 107.2.1, 2011 NEC. |
06/06/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
06/06/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Passed | |
06/06/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/06/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
06/06/2017 | ACONNOR1 | ENGINEERING | REVIEW | Passed | |
06/06/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/09/2017 | ARUIZ1 | WWM | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/09/2017 | ARUIZ1 | OUT TO CUSTOMER | Completed |