Permit Number: T17CM03267
Parcel: 11615088L

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T17CM03267
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/27/2017 MARTIN BROWN FIRE REVIEW Approved
05/02/2017 STEVE SHIELDS ZONING REVIEW Passed
05/16/2017 ROBERT SHERRY WATER REVIEW Completed
05/16/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The specified eyewash requires a minimum of 30-PSI flowing water pressure for proper operation; verify that this is available. Reference: Section 605.3, IPC 2012 as amended by the City of Tucson and ANSI Z358.1.
2. Verify that the developed length of the hot water supply piping from the hot water source (i.e. a recirculating hot water system) to the furthest sink is no more than fifty feet. Reference: Section 607.2, IPC 2012.
05/17/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide calculations demonstrating adequate ventilation. Reference: Section 403.2, IMC 2012.
2. EF-101 is equipped with a bag-in bag-out HEPA filter: provide information to justify not calling the exhaust from the hazardous drug room, the chemo room, and the chemo hood "hazardous". Reference: Section 510.2, IMC 2012.
3. Clarify the reason for installing a fire/smoke damper at the existing shaft located on an exterior wall. Reference: Section 107.2.1, IBC 2012.
05/17/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A0.03; Toilet Grab Bar: A vertical grab bar is required on the sidewall per the ICC/ANSI Figure 604.5.1. Please add.
2. Sheet A0.03; Roll in Shower Grab Bars/Controls: Please verify the grab bars/control/handshower locations are in conformance with the ICC/ANSI Section 608.
3. Sheet A0.04; Floor Plan Key Notes: Note 4 indicates the general contractor shall verify the fire resistance rating of an existing wall, and modify the wall as required to achieve a one hour rating. The architect of record is required to make that determination of the fire resistance rating of the walls. Please revise the note. Reference Sheet A4.10 on the drawings for partition types and fire resistance ratings.
4. Sheet A0.04; Floor Plan Key Notes: Note 5 indicates the general contractor shall verify the fire resistance rating of an existing door, and modify the door as required to achieve a 45 minute rating. The architect of record is required to make that determination of the fire resistance rating of the doors. Please revise the note. Reference Sheet A4.20 on the drawings for door types and fire resistance ratings.
5. Sheet A0.04; Floor Plan Key Notes: Note 6 indicates the general contractor shall verify the fire resistance rating of an existing wall, and modify the wall as required to achieve a one hour rating. The architect of record is required to make that determination of the fire resistance rating of the walls. Please revise the note. Reference Sheet A4.10 on the drawings for partition types and fire resistance ratings.
6. Sheet A0.04; Floor Plan: Please provide a narrative on the drawings concerning the indicated fire resistance ratings required for various walls. Include a reference to the section of the IBC that requires the fire resistance rating, and the rating required.
7. Sheets A0.04, A2.11, and A2.21; General Floor Plan Notes: Please add a note at these sheets to reference Sheets A5.10 and A5.20 for special details at the fire resistance rated assemblies.
8. Sheet A1.21; Basement Level Plan: Please provide a north arrow on the plan.
9. Sheet A2.11; Demolition Key Notes: Note 3 was not located on the plan. Please verify.
10. Sheets A2.11 and A2.21; Demolition Key Notes: Note 8 indicates to fill the opening in the floor slab with a two hour rated concrete slab and deck. Please add to that note to reference Sheet A5.10 for the concrete slab and deck detail and fire resistance rating.
11. Sheet A2.11; Basement Floor Plan (Key Notes): Note 1 indicates to infill corridor walls with a one hour fire resistance rated assembly. Please provide a reference to Sheet A4.10 for partition types and fire resistance ratings.
12. Sheet A2.11; Basement Floor Plan (Key Notes): See plan review comments 3, 4, and 5 for Key Notes 4, 5, and 6.
13. Sheet A2.12; Equipment Plan (Keyed Notes): Note 2 was not located on the plan. Please verify.
14. Sheets A2.12 and A2.22; Equipment Plans: Please verify on the drawings the hazardous materials meet the requirements of the IBC Sections 307 and 414 for storage, quantities, control areas, etc.
15. Sheet A4.10; Partition Type Notes: Note 10 references Sheet A6.51 for partition details. Please revise the reference.
16. Sheet A4.20; Door Schedule: Please provide fire resistant rated doors in this schedule as required.
17. Sheet A4.30; Section 10: Details 3/A4.30 and 2/A4.30 are referenced on this section. Please revise those section references.
18. General: Please provide written responses to all review comments.
05/23/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved