Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T17CM03077
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/01/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The specified gas pressure at the meter is 2-PSIG; show the location of the required pressure regulator(s). Reference: Section 107.2.1, IBC 2012. 2. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. the under-counter glasswasher). Reference: Section 604.9, IPC 2012. 3. Verify that the discharge from the glassware washer (kitchen equipment number 28) will be 140 degrees Fahrenheit or less. Reference: Section701.7, IPC 2012. 4. Provide separate indirect waste pipes for each drain from the ice cuber and ice bin to protect against cross-contamination or fouling (detail 5/P3.0). Reference: Section 801.2, IPC 2012. 5. Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012. 6. Verify that all of the vents (except for vents serving interceptors located outdoors) rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally (e.g. the hydromechanical grease interceptor). Reference: Section 905.4, IPC 2012. 7. Show how the flow control device is to be installed below the floor level and in accordance with the manufacturer's instructions and accessible for maintenance. Reference: Section 1003.4.2, IPC 2012. 8. Provide additional details regarding size of CO2 tank. If the system contains 100 pounds or more of CO2, specific requirements apply, including details involving ventilation, piping, and detection/alarms. |
05/02/2017 | FRODRIG2 | WWM | REVIEW | Reqs Change | The following is needed for Sewer Connection Fee Application Approval: Need PCRWRD/IWC/Steven Valencia’s review of grease interceptor. (Steven.valencia@pima.gov - 520-724-6200) |