Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM03077
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/20/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
04/20/2017 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Please provide acrhitectural stamps. Ariel views from google maps indicate potential problems with egress from west side of property. Please show what is happening once people leave patio. The patio should have an occupant load. Please clarify. |
04/20/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide registrant stamp on the plans. Otherwise the electrical is approved. |
04/20/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/20/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet a0.2; Exiting Plan: It appears there is a patio space on the left end of the building. Is this a dining area? If so, the area of the patio should be included in the total gross building area, in addition to adding occupants to the total load. 2. Sheet a3.0; Floor Plan Key Notes: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise. 3. Sheet a3.0; Key Plan: If the total occupant load is revised, please verify the required number for accessible seating meets the Code requirement. 4. Sheet a3.0 (Key Plan); Sheet a5.1 (Door Schedule): The door schedule does not list door 111b (at the patio). Please verify. 5. General: Per the IBC Section 3411.7, up to 20% of the project cost must be applied to accessibility issues. Please indicate on the drawings what accessible issue is part of that requirement (grab bars, accessibility into building, accessibility in building, etc.?). 6. General: Please provide north arrows on all plans. 7. General: Please provide professional stamps on all sheets. 8. General: Please provide written responses to all review comments. |
04/21/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Revise the mechanical drawings to clearly show the intended scope of work for this activity. Sheet M1.0 states that all mechanical equipment is existing but the key notes for the mechanical plan call for a new rooftop AC unit and a new exhaust fan. Fan coil FC-1 is noted as existing but it is not shown; show the unit and outside air duct for the unit. |
04/21/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
04/21/2017 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Passed | |
04/21/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/25/2017 | GERRY KOZIOL | WWM | REVIEW | Needs Review |