Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T17CM02387
Parcel: 10602001C

Address:
3964 N ORACLE RD

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T17CM02387
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/04/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Verify the required gas input for the XLT 3240 triple conveyor oven. The manufacturer's literature indicates an input of 88 MBH per standard oven (122MBH for a high performance oven) for a total input of 264 MBH, not 141 MBH. Reference: Section 402.2, IFGC 2012.
2. Verify the required gas input for the fryers; the drawings show an input of both 120 MBH and 160 MBH. Reference: Section 402.2, IFGC 2012
3. Revise the gas pipe sizes as required once the actual gas input load has been determined.
4. The specified water heater is listed for direct vent installation, not an atmospheric vent (as shown on sheet M1.0; coordinate with the mechanical designer. Reference: Section 305.1, IFGC 2012.
5. Correct the title of the Plumbing Water Floor Plan on P1.1.
6. Provide the manufacturer's installation requirements for the N-922 dishwasher.
05/04/2017 LBOJORQ1 WWM REVIEW Needs Review
05/04/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Verify that the existing demising wall by hood KH-1 is constructed with non-combustible supports. Reference: Section 507.9, IMC 2012.
2. Include the structural details that show how both of the Type I hoods and the new AC units will be supported from the building structure. Verify with the manufacturer that the method of support is appropriate for hood KH-2. Reference: Section 302.1, IMC 2012.
3. Provide the listing information for the fryer hood that indicates that it does not have to comply with the requirements of Section 507.12, IMC 2012.
4. Revise the venting details for the water heater in coordination with the plumbing design. Reference: Section 107.2.1, IBC 2012.
5. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/18/2017 MMENDIB1 OUT TO CUSTOMER Completed