Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T17CM02387
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/04/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify the required gas input for the XLT 3240 triple conveyor oven. The manufacturer's literature indicates an input of 88 MBH per standard oven (122MBH for a high performance oven) for a total input of 264 MBH, not 141 MBH. Reference: Section 402.2, IFGC 2012. 2. Verify the required gas input for the fryers; the drawings show an input of both 120 MBH and 160 MBH. Reference: Section 402.2, IFGC 2012 3. Revise the gas pipe sizes as required once the actual gas input load has been determined. 4. The specified water heater is listed for direct vent installation, not an atmospheric vent (as shown on sheet M1.0; coordinate with the mechanical designer. Reference: Section 305.1, IFGC 2012. 5. Correct the title of the Plumbing Water Floor Plan on P1.1. 6. Provide the manufacturer's installation requirements for the N-922 dishwasher. |
05/04/2017 | LBOJORQ1 | WWM | REVIEW | Needs Review | |
05/04/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the existing demising wall by hood KH-1 is constructed with non-combustible supports. Reference: Section 507.9, IMC 2012. 2. Include the structural details that show how both of the Type I hoods and the new AC units will be supported from the building structure. Verify with the manufacturer that the method of support is appropriate for hood KH-2. Reference: Section 302.1, IMC 2012. 3. Provide the listing information for the fryer hood that indicates that it does not have to comply with the requirements of Section 507.12, IMC 2012. 4. Revise the venting details for the water heater in coordination with the plumbing design. Reference: Section 107.2.1, IBC 2012. 5. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/18/2017 | MMENDIB1 | OUT TO CUSTOMER | Completed |