Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T17CM02387
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/28/2017 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
03/28/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
03/28/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | `PLEASE SHOW THE LOCATIONS OF ALL THE MECHANICAL EQUIPMENT ON THE MECHANICAL SCHEDULE, ON THE ELECTRICAL FLOOR PLANS, AS REQUIRED PER THE CITY OF TUCSON COMMERCIAL ELECTRICAL PLAN SUBMITTAL REQUIREMENTS. REF: 2012 IBC SEC. 107.2.1, 2011 NEC. |
03/28/2017 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
03/28/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET T1.0; PROJECT GENERAL NOTES: PLEASE COMPLETE THE INFORMATION REQUIRED IN NOTE A. 2. SHEET T1.0; INDEX: THE INDEX INDICATES SHEETS C1, C2, C3, S1, AND S2. THESE SHEETS ARE NOT INCLUDED IN THIS SUBMITTAL. PLEASE PROVIDE. INCLUDE ALL STRUCTURAL DETAILS SHOWN IN CALCULATIONS. 3. SHEET A1.0; FLOOR PLAN; WALL TYPES: FOR THE NEW ONE HOUR FIRE RESISTANCE RATED WALL DESCRIPTION, PLEASE ADD THE U.L. LISTING NUMBER FOR THE 3 5/8" AND THE 6" STUD WALLS. 4. SHEET A1.0; WALL TYPES: FOR ALL NEW WALLS, PLEASE INDICATE THE METAL STUD GAUGE AND SPACING ON THIS SHEET. 5. SHEET A8.0; SECTION 4: FOR THE BRACING AT THE TOP OF THE PARTITION, INCLUDE THE BRACE SIZE AND NUMBER OF CONNECTORS TO THE TOP OF THE WALL AND TO THE STRUCTURE ABOVE (ROOF STRUCTURE MEMBERS ARE AT 32" O.C. PER THE STRUCTURAL REPORT). 6. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
03/28/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
03/28/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
03/28/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/29/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/04/2017 | LBOJORQ1 | WWM | REVIEW | Needs Review |