Permit Number: T17CM02114
Parcel: 116206330

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T17CM02114
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/28/2017 KEN BROUILLETTE FIRE REVIEW Approved
03/30/2017 LOREN MAKUS ENGINEERING REVIEW Approved
04/04/2017 SSHIELD1 ADA REVIEW Passed
04/04/2017 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Principle Planner

PROJECT: West End Station
T17CM02114
Building Plan (1st Review)

TRANSMITTAL DATE: April 03, 2017

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Until the plans are approved by the Design Professional Zoning cannot approve the plans.

3. The development package sheets provided in the building plan set will either need to be the approved signed set, marked as reference only or removed from the building plans.

4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
04/04/2017 SSHIELD1 ZONING HC REVIEW Passed
04/13/2017 AHINES2 DESIGN PROFESSIONAL REVIEW Denied Project subject IID/DRB review.
04/14/2017 AHINES2 WATER REVIEW Reqs Change The private utility plan (C105) shows two 2" water meters connected to serve the building. Tucson Water will not allow water meters and backflow preventers to be manifolded to achieve additional capacity. Contact Tucson Water to arrange for the installation of a 3" water meter.
04/14/2017 GERRY KOZIOL WWM REVIEW Reqs Change The following is needed for Sewer Connection Fee Application Approval:

Need DP review per letter to WLB Group dated 4/11/2014. (This project has not been approved by PCRWRD).

Needs to build public sewer.

Needs COT water meter review/approval for two 2” water meters in series.

Per COT Water, no existing water meters have been identified paying user fees, so no PCRWRD credit will be given.

Need PCRWRD/IWC/Steven Valencia review of underground parking garage drains with 750 gallon sand/oil interceptor pumped to sewer per drawings P100 & P101 dated 3/14/17 - Steven.valencia@pima.gov – 520-724-6200.

*Type III Capacity Allocation #2017-77 has been approved 4/13/17 per PCRWRD/Kurt Stemm.
04/17/2017 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved
05/24/2017 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Completed
05/24/2017 AHINES2 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/25/2017 AHINES2 OUT TO CUSTOMER Completed