Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T16CM07194
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/23/2016 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | It appears the door at rear of establishment (sheet A1.0, note 30) is a required exit. The 2 doors at the front are not far enough apart to count as separate exits. Therefore, panic hardware shall be installed at rear exit. Please remove all notes on cover sheet regarding fire sprinklers, as there are no sprinklers in the building. Please include response letter indicating how comments have been addressed. |
09/27/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Where are the hand sinks for the food preparation areas? Reference: Section 107.2.1, IBC 2012. 2. Clarify status of the water heater; on sheet AA1.0 it is existing to remain but on sheet P2.1 it appears to be a new appliance. Reference: Section 107.2.1, IBC 2012. 3. Clarify the drain configuration for the dump sink (K29) it is shown as being directly-connected in detail 1/P3.1 and specified as directly-connected in the plumbing fixture schedule but no waste or vent sizes are called out in the schedule. Similarly, the blender station (K28) is shown as being indirectly-connected in detail 1/P3.1 and no waste or vent sizes are called out in the schedule but it is described as being directly-connected in the plumbing fixture schedule. Reference: Section 301.3, IPC 2012. 4. A dishwasher may not discharge through a hydromechanical grease interceptor (e.g. a Schier GB-75) but it is required to discharge through a gravity grease interceptor. Reference: Section 1003.3, IPC 2012, as amended by the City of Tucson. 5. Provide a complete diagram of the natural gas distribution system showing the all of the loads (e.g. the two fryers and the range, in addition to the water heater), developed lengths, and the layout of the distribution piping. Verify that the existing gas piping is not overloaded. Reference: Section 107.2.1, IBC 2012. |
09/27/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/27/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a design for the proposed Type I hood installation that clearly shows that the installation will comply with the requirements of Sections 302, 506, 507, and 508, IMC 2006. Reference: Section 107.2.1, IBC 2012. 2. Demonstrate energy code compliance for the alterations to the building envelope (e.g. the new doors, glazing, and exterior infill walls) based on the current code. Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012. |
10/12/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/12/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Ref: plan sheet E6.0 Per the one line diagram, it appears the 400 amp all in one service #1 is also designated as panel 'C'. That being the case, the load calc's for panel 'C' would be a combination of panel 'A' and 'B'. Please revise the load calc's shown and include panel 'A'. Also the panel schedule for panel 'C' should include OCPD for panel 'B'. Ref: 2012 IBC 107.2.1, 2011 NEC. |