Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T16CM03514
Parcel: 11202003D

Review Status: Completed

Review Details: REVISION - - 2ND

Permit Number - T16CM03514
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/21/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The mechanical equipment schedule calls for (3) 250-ton chillers but COMcheck is based on a single 500-ton chiller. (Note: the entering and leaving water temperatures for the chillers and the cooling towers are reversed in the equipment schedules.) [Second comment: The Mechanical Compliance Certificate was not found with this submittal.] [Initial comment: Coordinate the description of the chillers used in the Mechanical Compliance Certificate with the scheduled equipment.]
02/21/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Detail 68/P6.1 still shows shut off valves between the expansion tank and the two water heaters. [Second comment: No shut-off valves are to be located between the expansion tank and the water heaters.] [Initial comment: Revise the water heater detail, 68/P6.1, to relocate the thermal expansion tank to the cold water supply to the water heaters (it is currently shown connected to the natural gas piping). No shut-off valves are to be located between the expansion tank and the water heaters. Provide the size of the thermal expansion tank. Reference: Sections 303.2 and 607.3, IPC 2012.]
02/23/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
02/23/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
02/27/2017 KEN BROUILLETTE FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/06/2017 LBOJORQ1 OUT TO CUSTOMER Completed