Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel11202003D
City of Tucson ZoningO-3, PAD-11
Tucson WardWard 3
Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Special Development Requests & Requirements

Date - 12/23/2024 3:20 p.m.
Total Number Of Special Development Permits - (4)
Activity Number Status Apply Date Expired Date Type Description
T16SA00013 Complete N/A
T18SA00251 Withdrwn N/A MASTER SIGN PROGRAM FOR BANNER CANCER CENTER WAS SUBMITTED JUNE 2018, T18SA00251 / MSP-18-08 NOW IN WITHDRAWN STATUS DUE TO AGE OF SUBMITTAL AND REVISIONS DONE WITHOUT SDRC REVIEW. CASE WAS RESUBMITTED JULY 2019 - NEW CASE MSP-19-07 / T19SA00271
T19SA00271 Withdrwn N/A SEE T19SA00318 with most updated plan set submitted July 25, 2019. This case number T19SA00271 withdrawn. MASTER SIGN PROGRAM (MSP-19-007) - BANNER CANCER CENTER (SUBMITTED ORIGINALLY JUNE OF 2018, THEN PUT ON HOLD FOR REVISIONS. UPDATED PLANS NOW TO PROCEED FOR REVIEW.)
T19SA00318 Approved N/A Master sign program review request - MSP-19-007 - updated plan set 7/25/19. Banner University Medical Center North Campus - Cancer Center. 11 Detached signs of varying sizes, heights, sign area (some illuminated). Variations to setbacks, sign area, signs on local street and arterial street.

Permits

Parcel Number - 11202003D
Date - 12/23/2024 3:20 p.m.
Total Number Of Permits - (98)
Permit Permit Status Entered Date Expired Date Unit Type Description
T22CM00996 Expired 02/09/2022 09/05/2022 2 Commercial Building Receptacle additions
DP16-0030 Complete 02/18/2016 10/08/2019 Development Package SITE/PLOT PLAN/GRADING/SWPP BANNER UMC NORTHREVISION #1 (PG 3-4 & 46-53)
T19OT00252 Issued 03/18/2019 06/16/2020 Sign - Permanent MASTER SIGN PROGRAM - NEW FREESTANDING SIGNS & REVISION OF WALL SIGNS PERMITTED & INSTALLED UNDER T1
T22CM02289 Issued 03/30/2022 04/16/2023 02 Commercial Building Approx. 1,119 SF of interior renovations to expand the Audiology department and relocate schedulers
T22CM03149 Issued 04/27/2022 11/15/2022 Commercial Building Stark Electric is installing the electrical and TEP said they will need a completed inspection of th
T18OT00619 Submitted 06/08/2018 N/A Sign - Permanent PERMIT SUBMITTAL FOR MASTER SIGN PROGRAM (FREESTANDING SIGNAGE) - UPDATED - BUILDING SIGNAGE UNDER T
T18OT00989 Issued 09/13/2018 03/24/2019 Sign - Permanent Permanent Wall signage for UMC Banner Cancer Center in PAD zone
T21FC00761 Expired 10/11/2021 10/19/2022 02 Fire Construction Permit Automatic Fire Extingshing Sys - Bldg 2 - Modify existing wet pipe fire sprinkler system.; Commercial Fire Sprinkler Systems - Modification of heads: 19
T21TUP0019 Approved 11/18/2021 11/19/2024 Zoning Permit Annual Temporary MRI Trailers
T06AN00482 Issued 04/28/2006 N/A ADDRNEW
T06BU01321 Final 05/25/2006 06/23/2008 06 GRADING GRADING: 671CY CUT 287CY FILL
T06BU01765 Final 07/13/2006 02/27/2007 WALL/FEN WALL:RETAINING 148 LF OF 1-5' W/3'6" ON TOP
T06BU02423 Closed 10/06/2006 11/08/2008 WALL/FEN WALL:MONUMENT SIGN UMC NORTH 10 LF OF 7'
T06BU02702 Final 11/15/2006 05/27/2008 06 SPKLR ADD 233 NEW FIRE SPRINKLERS
T06BU02724 Final 11/16/2006 05/26/2008 06 BUILD FIRE ALARM FOR NEW RONALD MCDONALD HOUSE
T06CM03151 C of o 05/25/2006 06/17/2008 06 COMBO NEW: TRANSIENT LODGING FOR FAMILIES OF CHILDREN RECEIVING CANCER TREATMENT
T06EL02280 Closed 11/22/2006 11/11/2008 ELECT OUTDOOR LIGHTING CODE REVIEW ONLY
T06EX00828 Closed 06/27/2006 08/26/2006 EXCAV EXCA:36"X24" IN DIRT PLACE VAULT
T06OT02664 Final 10/13/2006 03/03/2009 SIGN 11987
T06PL02153 Closed 11/21/2006 11/08/2008 01 PLUMB ADD WATER LINE TO FOOD UNIT
T06PL02165 Void 11/27/2006 N/A PLUMB PLUMBING:FROM WALL TO FOOD UNITS IN COFFEE SHOP
T07BU00274 Final 02/05/2007 09/15/2007 WALL/FEN WALL: ADD 3'6" ON TOP OF EXISTING 2'6" RETAINING
T07BU00358 Withdrwn 02/14/2007 08/14/2007 TENTS TENT:GRAND OPENING CEREMONY
T07BU00808 Final 04/12/2007 05/25/2008 06 BUILD INSTALLATION OF KITCHEN EXHAUST HOOD FIRE EXTINGUISHING SYSTEM
T07BU01198 Closed 05/29/2007 12/18/2007 SPKLR Add 1 fire sprinkler
T07BU02219 Final 10/18/2007 11/12/2008 06 SPKLR FIRE SPKR:ADD 30LF OF 4" FIRE SERVICE UNDERGROUND
T07EX00565 Closed 06/06/2007 08/05/2007 EXCAV TRENCH 14'D ALONG ALLEN RD ON SOUTH SIDE OF ADDRE
T07EX01101 Closed 10/12/2007 12/11/2007 EXCAV TRENCHING 20'D (INSTALL 4: FIRE SERVICE & 2" WATER
T07OT00852 Closed 04/10/2007 10/18/2007 01 REGPLANT REG PLANT:
T07OT02654 Final 11/26/2007 12/22/2008 06 SIGN 14069
T08BU00250 Closed 02/08/2008 08/06/2008 06 TENTS 40' X 80' TENT
T08BU00396 Final 02/29/2008 08/30/2008 TENTS TENT:
T08CM02175 Final 06/19/2008 12/27/2008 01 COMBO ADDITION: SHADE STRUCTURE 528 S.F.
T08OT00777 Closed 04/02/2008 11/08/2008 REGPLANT CANCER CENTER BLDG 1
T09BU00344 Final 03/11/2009 09/09/2009 TENTS TENT:40X100
T09CM00750 Expired 04/03/2009 12/02/2009 01 COMBO TI:RADIOLOGY
T09OT01233 Final 06/17/2009 12/16/2009 01 REGPLANT CANCER CENTER CLINIC AT UMC NORTH
T11BU01011 Final 08/02/2011 04/02/2012 SPKLR Install 48 fire sprinklers
T11BU01475 Final 11/08/2011 08/01/2012 01 SPKLR Install 28 fire sprinklers
T11CM01971 Final 06/24/2011 06/03/2012 01 COMBO TI; UMC UROLOGY CLINIC
T11CM03099 Final 09/27/2011 08/15/2012 01 COMBO TI: UMC MEDICAL OUTPATIENT
T11EL00459 Expired 02/17/2011 08/16/2011 ELECT ELECTRIC:DUSK TO DAWN LIGHTS
T11OT00600 Final 03/31/2011 12/31/2011 REGPLANT RESISTERED PLANT
T12CM04387 Final 07/19/2012 12/18/2013 COMBO REMOVE/INSTALL ANTENNAS AND ASSOCIATED EQUIPMENT ON EXISTING WIRELESS FACILITY
T12OT01006 Final 07/05/2012 12/31/2013 REGPLANT REGISTERED PLANT
T13OT01007 Final 08/26/2013 12/31/2014 01 REGPLANT REGISTERED PLANT
T15BU01107 Final 09/23/2015 03/23/2016 TENTS TENT
T16BU00171 Expired 02/01/2016 08/10/2016 DEMO REMOVE BALLASTED TEMP MONOPOLE AND EQUIPMENT SHELTER
T16BU01191 Closed 08/18/2016 04/11/2023 SPKLR SPRINKLER - UNDERGROUND
T16CM02493 Expired 04/05/2016 06/27/2018 COMBO FOUNDATION ONLY - 3 STORY PARKING STRUCTURE- BANNER HEALTH.
T16CM02494 Expired 04/05/2016 07/08/2017 COMBO FOUNDATION ONLY - 3 STORY, 207,000 SQ FT MEDICAL CENTER - BANNER HEALTH.
T16CM03513 Final 05/09/2016 06/26/2019 COMBO 3 STORY PARKING SUPER STRUCTURE- BANNER HEALTH.
T16CM03514 C of o 05/09/2016 10/08/2019 01 COMBO HOSPITAL
T16CM05075 Expired 06/30/2016 04/08/2017 COMBO PRIVATE SEWER - BANNER HEALTH
T16CM06188 Withdrwn 08/08/2016 N/A COMBO MOCK UP
T16CM06577 C of o 08/24/2016 10/08/2019 COMBO 3 STORY PARKING STRUCTURE FINAL PHASE
T16EX01374 Final 04/19/2016 06/27/2016 EXCAV Blocking of sidewalk to add ADA Ramp per COT Standard Details for crosswalk coming from parking lot on South side of Allen Street. Alternate route of sidewalk traffic will be supplied. See attached sketch. Reference Temporary Usage Permit # T16TUP0005 and DP16-0030.
T16EX01458 Final 04/22/2016 06/21/2016 EXCAV Removing underground sweep on pole located 650' East of Campbell and on the North side of Allen. TEP crews to park in parking lot north of pole.
T16FC00172 Final 11/01/2016 10/06/2019 10 FIRECONS Install complete fire sprinkler system in parking garage
T16FC00212 Final 11/07/2016 10/06/2019 FIRECONS INSTALL NEW FIRE ALRAM SYSTEM
T16FC00225 Final 11/14/2016 10/06/2019 FIRECONS INSTALL NEW UNDERGROUND AND FIRE SPRINKLER SYSTEM
T16RW00801 Final 07/26/2016 08/31/2016 ROW Install new 8" Water in Allen Rd. between Campbell to Warren. Work to done at night so to not disrupt daytime business. Road to be closed only during night work hours 10/17/16 CHANGE OF HOURS 5 AM - 4 PM R2 10/19/16 5 AM - 4 PM SAT/SUN ONLY R3
T16TC00960 Final 04/19/2016 N/A BARRICAD Blocking of sidewalk to add ADA Ramp fper COT Standard Details or crosswalk coming from parking lot on South side of Allen Street. Alternate route of sidewalk traffic will be supplied. See attached sketch. Reference Temporary Usage Permit # T16TUP0005 and DP16-0030.
T16TC00999 Final 04/22/2016 N/A BARRICAD Removing underground sweep on pole located 650' East of Campbell and on the North side of Allen. TEP crews to park in parking lot north of pole.
T17CM06755 Final 09/05/2017 08/14/2018 COMBO UNDER SLAB DOMESTIC WTR LINES
T17CM07498 C of o 10/03/2017 10/08/2019 02 COMBO HOSPITAL
T17FC00260 Final 03/30/2017 11/06/2018 02 FIRECONS New fire alarm system
T17FO00777 Final 09/18/2017 03/19/2018 FIREOPER TENT (1) SET UP DATE 9/20/17
T17RW00020 Final 01/03/2017 03/05/2017 ROW SETTING ONE POLE IN THE ROW AT THE NE CORNER OF CAMPBELL AV AND ALLEN ST
T17RW00370 Final 01/23/2017 02/23/2017 ROW (2) 5x5 BELLHOLES IN ASPHALT ON ALLEN RD TO DIG AND INSPECT NEW GAS LINE
T17RW01286 Final 03/21/2017 10/11/2017 ROW This is in relation to COT Job # U-2016-007. Relocating facilities for new turn lane on E Allen Rd in assoc with new Banner Health Medical Bldg. Remove & replace 155' of aerial fiber crossing N Campbell Ave, pl 2 fiberglass hh and 15' of 4" conduit on north side of Allen Rd. Pl 4 peds and remove 903' of copper aerial cable from poles along the north side of Allen Rd and then access two manholes to pull fiber and splice.
T17RW01302 Expired 03/22/2017 05/29/2017 ROW Starting on the N/W Corner of E Allen Rd and N Campbell Ave Tie in and Overlash .48 Ct and .144 ct fiber going East for 150' Riser down pole from TEP Pole Wreck out and Replace 24CT, 52 CT, and .96 CT Fiber with NEW .44 CT and 144CT Fiber going East through Existing conduit for 600' to Cox Vault From Vault Going South through Existing conduit with 144CT fiber for 200'. From Same Vault Pulling through Existing Conduit continue East for 263' over pulling .48ct fiber then Placing a New cox PED From PED continue East over pulling .48CT Fiber for another 373' placing another cox PED
T17RW01476 Expired 04/04/2017 08/03/2017 ROW TEP will be removing 7 poles, installing underground TEP equipment in easements, and occupying approx 1200' of underground conduit in ROW. Lane closures will be required, communications will be affected by overhead removal. WO's 6141927, 6175365, 6090030
T17RW02627 Expired 06/16/2017 11/28/2017 ROW Starting on the N/W Corner of E Allen Rd and N Campbell Ave Tie in and Overlash .48 Ct and .144 ct fiber going East for 150' Riser down pole from TEP Pole Wreck out and Replace 24CT, 52 CT, and .96 CT Fiber with NEW .44 CT and 144CT Fiber going East through Existing conduit for 600' to Cox Vault From Vault Going South through Existing conduit with 144CT fiber for 200'. From Same Vault Pulling through Existing Conduit continue East for 263' over pulling .48ct fiber then Placing a New cox PED from PED continue East over pulling .48CT Fiber for another 373' placing another cox PED 09/11/2017-PLAN CHANGE-FROM 2ND COX VAULT, PULL THROUGH EXISTING CONDUIT HEADING NORTH 25' TO OUT OF ROW
T17RW04004 Final 09/11/2017 10/13/2017 ROW TEP WILL BE REMOVING 7 POLES; LANE CLOSURE WILL BE REQUIRED. NO SIDEWALK WILL BE DISTURBED FOR THE WORK
T18CM02700 C of o 04/12/2018 10/08/2019 02 COMBO CARE CLINIC
T18FC00001 Final 01/02/2018 12/11/2018 FIRECONS 3RD FLR - OB/GYN Tenant Improvement - Add 49
T18FC00110 Final 02/01/2018 12/11/2018 FIRECONS MODIFY EXISTING WET PIPE FIRE SPRINKER SYSTEM.
T18FC00588 Final 07/19/2018 06/04/2019 FIRECONS MODIFY EXISTING WET PIPE FIRE SPRINKER SYSTEM.
T18FC00631 Final 08/02/2018 06/04/2019 FIRECONS MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM
T18FC00697 Final 08/21/2018 06/04/2019 FIRECONS Add to Existing Fire Alarm System
T18FC00821 Final 10/08/2018 06/04/2019 FIRECONS ADD/DELETE TO EXISTING FIRE ALARM SYSTEM
T18FO00860 Final 10/04/2018 04/06/2019 01 FIREOPER PERMIT FOR OUTDOOR O2 MED GAS STORAGE TANK
T18FO00861 Final 10/04/2018 04/06/2019 01 FIREOPER PERMIT FOR BANNER UMC CANCER CENTER
T18FO00862 Final 10/04/2018 04/06/2019 01 FIREOPER PERMIT FOR EMERGENCY GENERATOR WITH INTEGRATED FUEL TANK
T19CM01587 Expired 03/06/2019 09/02/2019 02 COMBO TI: TEMPORARY PHARMACY
T19CM01591 C of o 03/06/2019 01/31/2021 01 COMBO PHARMACY
T19CM08264 L of c 11/08/2019 06/27/2020 COMBO TI: PHARMACY
T19FC00670 Final 08/22/2019 12/20/2020 FIRECONS TO MODIFY EXISTING FIRE SPRINKLER SYSTEM
T19FC00701 Final 09/03/2019 11/04/2020 FIRECONS TI - Pharmacy
T19FO00842 Final 10/09/2019 04/19/2020 02 FIREOPER OUTPATIENT FACILITY
T19FO00843 Final 10/09/2019 04/12/2020 FIREOPER OUTPATIENT FACILITY
T19FO00844 Final 10/09/2019 04/12/2020 FIREOPER o2 gas permit for banner cancer center
T19FO00845 Final 10/09/2019 04/12/2020 02 FIREOPER o2 gas permit for banner cancer center
T19RW03908 Final 07/12/2019 11/24/2019 ROW BORE 166' OF NEW CONDUIT TO HH #20438. ACCESS MH #20364 TO SPLICE FIBER.
T21CM06424 C of o 08/09/2021 06/25/2022 02 COMBO Pharmacy
T21RW00667 Final 02/10/2021 03/27/2021 ROW CAMPBELL CURBED DELIEATOR INSTALLATION. (1 DAY INSTALLATION) BRIEF SERVICE STOP WITH SHADOW TRUCK ALONG CURB TO INSTALL PRODUCT. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
T22FO00785 Final 09/19/2022 04/18/2023 FIREOPER 1.4G CLOSE PROX DISPLAY FOR RONALD MCDONALD HOUSE CHARITIES.OCTOBER 7, 2022.

Code Enforcement

Parcel Number - 11202003D
Date - 12/23/2024 3:20 p.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
T08FR04095 Field 10/31/2008 N/A FIREINSP Request for Inspector
T09FR02680 Complete 08/14/2009 N/A FIREINSP Full Fire Prevention Inspection

Plans

Parcel Number - 11202003D
Date - 12/23/2024 3:20 p.m.
Total Number Of Plans - 4
Plan Number Plan Status Application Date Expired Date Unit Type Description
CWH-16-0030 Active 02/18/2016 10/08/2019 Basin SITE/PLOT PLAN/GRADING/SWPP BANNER UMC NORTHREVISION #1 (PG 3-4 & 46-53)
C9-04-23 Effected 12/21/2005 N/A REZONING PROCEDURES Proposal for a Planned Area Development (PAD) to develop a medical treatment campus for outpatient cancer treatment, and related medical and residential services. The proposed medical campus will consist of twelve buildings, varying in height from 45 to 75 feet tall including four parking structures on 16.4 acres. PAD 11 zoning effectuated on October 14, 2005.
T06PI00062 Final 12/13/2006 03/23/2008 PAVING & SEWER RONALD MCDONALD HOUSE PIA PLAN
T16PI00005 Final 04/18/2016 02/28/2021 PAVING & SEWER BANNER UMC NORTH CAMPUS Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan U-2016-007 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction.