Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T16CM03514
Parcel: 11202003D

Review Status: Completed

Review Details: REVISION - - 2ND

Permit Number - T16CM03514
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The Mechanical Compliance Certificate was not found with this submittal. [Initial comment: Coordinate the description of the chillers used in the Mechanical Compliance Certificate with the scheduled equipment.]
2. Provide documentation of the NFRC-certified fenestration or state on the drawing, "The maximum NFRC certified U-value and SHGC shall be ..." [Initial comment: Provide documentation for the windows noted in the Envelope Compliance Certificate for which NFRC-certified Solar Heat Gain Coefficients and U-factors have not been shown. Reference: Section C303.1.3, IEC 2012.]
3. As noted in the COMcheck Envelope Compliance Certificate, the reduced indoor lighting power option was selected as the additional efficiency package requirement to comply with Section C406, IECC 2012. The lighting plans however do not show compliance with the requirements of Section C406, IECC 2012. Reference: Section C401.2, IECC 2012.
4. See Section C408.2, IECC; general notes 33 and 34 do not address all of the issues associated with commissioning the building. [Initial comment: Provide notes on the drawings indicating what provisions have been made for commissioning the mechanical building systems per Section C408.2, IECC 2012].
01/06/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide third-party listing and material standards for the counter-mounted sink, S-X, and the scrub sink, S-X2. [Initial comment: Provide third-party listing and material standards for all plumbing fixtures being provided by others. Reference: Sections 303.4 and 402, IPC 2012.]
2. State the total amount of water to be delivered in each cycle and the cycle time. [Initial comment: Provide an automatic faucet for the public lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-03.]
3. No shut-off valves are to be located between the expansion tank and the water heaters. [Initial comment: Revise the water heater detail, 68/P6.1, to relocate the thermal expansion tank to the cold water supply to the water heaters (it is currently shown connected to the natural gas piping). No shut-off valves are to be located between the expansion tank and the water heaters. Provide the size of the thermal expansion tank. Reference: Sections 303.2 and 607.3, IPC 2012.]
01/13/2017 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change PLEASE ADDRESS THE FOLLOWING ELECTRICAL PLAN REVIEW COMMENTS. ALSO PROVIDE A WRITTEN RESPONSE.
#1. REF: PLAN SHEETS E5.1, E7.1.1.
The One-line diagram shows panel MPDP1 rated at 480 / 277 volts. The panel schedule shows it at 208 / 120 volts.
#2. REF: PLAN SHEETS E5.1, E7.2.1, E7.3.1.
The One-line diagram shows panels HMP2 and HMP3 rated at 200 amps. The panel schedules show them rated at 150 amps.
#3. REF: PLAN SHEET E5.1, E7.1.2
The one-line diagram shows panel HM1 rated at 200 amps. The panel schedule shows it rated at 125 amps.
REF : 2012 IBC sec. 107.2.1, 2011 NEC,
01/24/2017 MARTIN BROWN FIRE REVIEW Approved
12/30/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/09/2017 FERNE RODRIGUEZ OUT TO CUSTOMER Completed