Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM03369
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/05/2016 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
| 05/05/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide heating/cooling load calculations to justify the capacities of the proposed heat pumps. |
| 05/05/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 05/05/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 05/05/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET S1.0; ROOF FRAMING PLAN: PLAN NOTE 8 INDICATES NEW MECHANICAL TO REPLACE EXISTING UNITS OF EQUAL OR GREATER WEIGHT. PLEASE INDICATE IF THE NEW UNITS ARE HEAVIER THAN THE EXISTING, A STRUCTURAL ANALYSIS FOR THE EXISTING ROOF STRUCTURE IS REQUIRED. 2. SHEET S1.0; SECTIONS A AND B: PLEASE INDICATE THESE SECTION CUTS ON PLAN 2 ON SHEET A2. 3. SHEET P1; DETAIL 2: PLEASE INDICATE THE ANCHOR SIZE AND QUANTITY REQUIRED FOR THE FRAME CONNECTION TO THE EXISTING WALL. WHAT IS THE WALL CONSTRUCTION? INDICATE ADDITIONAL BRACING IN THE EXISTING WALL AS REQUIRED. 4. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 05/05/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 05/05/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 05/05/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/06/2016 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Sheet A1 indicates an area increase was taken for automatic sprinkler system. We have no record of a sprinkler system in this building or of any required sprinkler inspections. Please clarify. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/10/2016 | ARUIZ1 | OUT TO CUSTOMER | Completed |