Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Active
Review Details: POST 3RD PARTY REVIEW
Permit Number - T16CM02197
Review Name: POST 3RD PARTY REVIEW
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/12/2016 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
04/12/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | Be advised that if a carbon dioxide system (drink dispenser, etc.) of 100 pounds or greater is installed, a carbon dioxide detection and notification system must be installed. Have included a standard operating guideline with your plans for your review. |
04/12/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | Tucson Water limits a 1" meter to a maximum demand of 37.5 GPM. Provide a letter from Tucson Water confirming that the use of a 1" water meter will be allowed for this project. 4/12/16 : Meter size is actually 1-1/2", corrected at the counter. |
04/13/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/08/2016 | ANY | APPROVAL SHELF | RECEIVED |