Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM01968
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/30/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 04/14/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 04/14/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 04/14/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 04/14/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the alterations to the building envelope based on the current code. Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012. 2. Specify the required U-factors and Solar Heat Gain Coefficients (SHGC) for the fenestration and doors on the architectural drawings. Reference: Section C103.2, IECC 2012. 3. Show that the proposed HVAC systems meet the requirements of Sections C403.2 and C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 4. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. |
| 04/25/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/29/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |