Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T15PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/19/2015 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | Submit utility letters as soon as possible. |
02/19/2015 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | Submit utility letters as soon as possible. |
03/04/2015 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. Submit a copy of the approved NPPO plan 2. Submit the Landscape and Irrigation plans Note: private irrigation lines can not be placed under public streets. |
03/25/2015 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Reqs Change | March 5, 2015 SUBJECT: Robb Hill PIA Plan I-2015-001, DSD Activity TT15PI00003 PROJECT REVIEWER: Zelin Canchola, DOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. Resubmit with the following redlines on sheet 8 of 8. 1. Add skip lines for bike lane at the taper, WG (2x6), and WG8 (2x6) 2. Add "ONLY" marking to deceleration lane. 3. Bike lanes require a minimum of 5 feet. Change 4 feet to 5 feet. 4. For Street name sign add note "Submit shop drawing to Traffic Engineering for approval before fabricating street name signs. Contact Traffic Engineering at 791-4259 for information. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
03/25/2015 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
04/06/2015 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
04/06/2015 | LINZUNZA | DOT ENGINEERING | REVIEW | Denied | Date: April 3, 2015 PIA Project: Rob Hills, lots 1-53 & Common area A-1, B-1, C-1 & C2 PIA No.: T15PI00003 Plan No. I-2015-001 Project Reviewer: E. Craig Saltzman, Engineering Review Unit RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Engineering. Resubmit with the following: 1. Demonstrate existing storm sewer ( CB8 and CB10 sump condition) located in Speedway Blvd. can handle the flows, likewise the pavement spread 2. Verify pavement structural section design for the onsite streets. 3. Structural pavement section within Speedway Blvd. match existing structural pavement section. Reference: Plan Speedway Blvd., Pantano Road to Camino Seco I-83-20 , sht. 2 of 85 AS-Builts Change Order no. 5 (1 ½"Mix #3 on 3 ½" Mix #1 on 6" ABC on 6" Compacted Subgrade) If you have any questions I can be reached at 837-6621 or craig.saltzman@tucsonaz.gov |
04/06/2015 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | Submit utility letters as soon as possible. |
04/06/2015 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
04/06/2015 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | Submit utility letters as soon as possible. |
04/06/2015 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | Submit utility letters as soon as possible. |
04/06/2015 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | Submit utility letters as soon as possible. |
04/06/2015 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | Submit utility letters as soon as possible. |
04/06/2015 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | Submit utility letters as soon as possible. |
04/06/2015 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | Submit utility letters as soon as possible. |