Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 8200 E SPEEDWAY BL
Search
Permits
Address: 8200 E SPEEDWAY BL
Date - 01/15/2025 7:58 p.m.
Total Number Of Permits - (7)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP14-0187 | Complete | 10/10/2014 | N/A | Development Package | TENTATIVE PLAT/FLD - ROB HILL, LOTS 1-53, C.A. "A-1", "B-1", "B-2", C-1", "C-2" | |
DP15-0014 | Complete | 01/30/2015 | 12/18/2018 | Development Package | GRADING/SWPPP - ROB HILL SUBD | |
P97AN02384 | ISSUED | 10/15/1997 | N/A | ADDRNEW | ||
T15BU01475 | FINAL | 12/22/2015 | 08/06/2016 | DEMO | DEMO SFR | |
T15TC02796 | FINAL | 12/23/2015 | N/A | BARRICAD | SEWER REHABILITATION NO EXCAVATION | |
T16EX00181 | FINAL | 01/21/2016 | 03/22/2016 | EXCAV | PERMIT DESCRIPTION MODIFIED ON 2/09/16 PER RICHARD LEIGH. TRENCH AND INSTALL 320' LF, 6" WATER LINE. TIE INTO EXISTING 8" WATER LINE, INSTALL (1) 8"X6" TEE. INSTALL 200' OF 8" SEWER LINE AND INSTALL 2 - 48" MANHOLES 8/24/16 CUSTOMER RENEWED R4 | |
T16TC00167 | FINAL | 01/21/2016 | N/A | BARRICAD | INSTALLATION OF A WATER LINE AND ADDITION OF A TURN IN LANE TO NEW SUBDIVISION, ALSO CONSTRUCTION OF A DRAINAGE SCUPPER. 06/22/2016 - R3 PLAN CHANGE 8/24/16 CUSTOMER RENEWED R4 |
Plans
Address: 8200 E SPEEDWAY BL
Date - 01/15/2025 7:58 p.m.
Total Number Of Plans - (5)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
C9-13-13 | EFFECTED | 10/31/2013 | N/A | REZONING PROCEDURES -- REZONE | The rezoning request is associated with the development of a large lot residential parcel (133-24-001G) currently zoned Residence Zone (RX-1) to Residence Zone (R-2) - FLD (flexible lot development). The rezoning would allow for the development of a 64 lot single-family residential subdivision. The proposed site plan reflects the clustering of lots and use of functional open space areas. The Robb Wash is located west of the site and will remain undistrurbed. Todate two neighborhood meetings have been held. | |
S15-004 | FINAL | 01/16/2015 | 02/26/2020 | SUBDIVISION -- SUBD | FINAL PLAT | |
T13PRE0052 | CLOSED | 07/23/2013 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
T14PRE0058 | PLAN CK | 08/29/2014 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
T15PI00003 | CLOSED | 02/19/2015 | 02/09/2021 | PAVING -- 205 | ROBB HILL LOTS 1-53 & COMMON AREAS A-1, B-1, B-2, C-1 & C-2 Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2015-001 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction. |