Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: WALK THRU - COMM
Permit Number - T15CM06499
Review Name: WALK THRU - COMM
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/24/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
11/25/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/25/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Scuppers drain discrete roof areas; verify which area must drain the most rain water (remember to include any contributing areas that drain onto adjacent roof areas). Revise the roof drain calculations to include the effect of any vertical walls that can divert rainfall onto the roof. Provide overflow protection for the roof. Reference: Sections 1106.4 and 1108, IPC 2012. [Second comment: Comment not resolved; provide the hydraulic calculations used to determine the size of the scuppers. [Initial comment: The use of Table 1106.2, IPC 2012 is not an appropriate method for determining the size of a scupper. The table is for determining the size of vertical conductor and leaders; scuppers are weirs, not pipes and their sizes are hydraulically calculated. Provide calculations to determine the size of roof scuppers that are adequate to protect the roof from the rain load. Provide overflow protection for the roof. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.] |