Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T14PI00008
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T14PI00008
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/03/2014 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Approved
09/03/2014 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Approved
09/19/2014 JOSE ORTIZ DOT TRAFFIC REVIEW Approv-Cond September 19, 2014


SUBJECT: Sierra Morado Phase 3, Phase III

PLAN NUMBER: I-2014-008

PROJECT REVIEWER: Simon Ramos, EIT, Traffic Engineering, City of Tucson DOT

The Signing and Striping Section has completed the reviewed of the PIA plan and recommends a conditional approval of signing and striping plans. The following comments need to be addressed prior to submittal of the mylar plan set for signatures.

1. Include "Shop drawings for all signs including street name signs shall be submitted to Traffic Engineering (Diahn Swartz 520-791-4259) for approval before fabrication." in Signing General Notes.

2. On page 2 of 5, in Pavement Marking General Notes #6 and 7, DELETE "hot-sprayed"

3. Include all signing dimensions.

Please Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6678 or Simon.Ramos@tucsonaz.gov
09/23/2014 GARY WITTWER DOT LANDSCAPE REVIEW Approved
11/14/2014 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
11/14/2014 LINZUNZA DOT ENGINEERING REVIEW Denied September 25, 2014

SUBJECT: Sierra Morado Unit 3, Subdivision Phase 2

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: TDOT Permit Section has reviewed the PIA paving plan and recommends a conditional approval of the plans. The following comments need to be addressed prior to submittal of the mylar plan set for signatures. Please reference the PIA activity number T14PI00008 on all correspondences for this project.

1. Include the plan number "I-2014-008" in the title block of each sheet.
2. Include Development Services Department PIA activity number "T14PI00008 on cover sheet.
3. Revise title of project to "Subdivision Phase 2"


Please Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
11/14/2014 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed
11/14/2014 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved PER ERNIE ENCINAS - NO COMMENTS.