Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T14PI00006
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/07/2014 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
07/29/2014 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | July 28, 2014 SUBJECT: Sierra Morado Phase 3, Phase II PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section The Permits and Codes Section has completed the reviewed of the PIA paving plan and recommends a conditional approval of paving plans. The following comments need to be addressed prior to submittal of the mylar plan set for signatures. 1. Include the plan number "I-2014-005" in the title block of each sheet. 2. Include Development Services Department PIA activity number "T14PI00006 on cover sheet. 3. Indicate the placement of a concrete header per PC/COT SD 213 or a thickened pavement edge at the roadway pavement terminations. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
08/08/2014 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
08/20/2014 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
08/20/2014 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | July 29, 2014 PROJECT NAME: Sierra Morado Unit 3 PLAN #: I-2014-005 ACTIVITY NUMBER: T14PI00006 PROJECT REVIEWER: Simon Ramos, EIT, Traffic Engineering, City of Tucson DOT The Signing and Striping Section has completed the reviewed of the PIA plan and does not recommend approval at this time. The following comments need to be addressed in the subsequent plan submittal. Please return redlined drawings with next submittal and reference PIA activity number on all correspondences. 1. On page 6 of 10, Delete all striping, except for WS12 Crosswalk Stripe indicated in Signage and Striping Keynote #2. 2. On page 6 of 10, Signing General Notes #1 - Replace "2000" with "2009". 3. On page 6 of 10, Signing General Notes #6 - Replace with - "All warning signs shall be fluorescent yellow ASTM Type XI sheeting. All school signs shall be fluorescent yellow-green ASTM Type XI sheeting. All other signs shall be Type IV sheeting." 4. On page 6 of 10, Signing General Notes #9 - The posted speed limit is "25 mph". 5. On page 6 of 10, Signing General Notes #10 (added) - "All signs shall be treated with an anti-graffiti film that meets City of Tucson requirements and standards." 6. On page 6 of 10, Signing General Notes #11 (added) - "Shop drawings for all signs including street name signs shall be submitted to Traffic Engineering (Diahn Swartz, PE 520-791-4259) for approval before fabrication." 7. On page 6 of 10, Signage and Striping Keynote #3- Add "Keep Right/Hurricane" sign. 8. On page 6 of 10, Signage and Striping Keynote #5- Delete "25 mph" sign. 9. On page 6 of 10, Signage and Striping Keynote #6- Delete R8-3a "No Parking" sign. 10. On page 6 of 10, Signage and Striping Keynote #7- Delete R8-3a "No Parking" sign. 11. On page 6 of 10, Signage and Striping Keynote #8- Delete R3-9b "Center Lane" sign. 12. On page 6 of 10, Signage and Striping Keynote #9- Delete R1-1 "Stop" sign. 13. On page 6 of 10, Signage and Striping Keynote #10- Delete R1-1 "Stop" sign. 14. On page 6 of 10, Signage and Striping Keynote #11- Delete R8-3a "No Parking" sign. 15. On page 6 of 10, Signage and Striping Keynote #12- Delete R8-3a "No Parking" sign. 16. On page 6 of 10, Signage and Striping Keynote #13- Replace W8-3 "Pavement Ends" sign with W14-1 "Dead End" sign. 17. On page 6 of 10, Signage and Striping Keynote #14- Delete R1-1 "Stop" sign. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6678 or Simon.Ramos@tucsonaz.gov --------------------------------------------------------------------------------------- August 20, 2014 SUBJECT: Sierra Morado Phase 3, Phase II PLAN #: I-2014-005 ACTIVITY NUMBER: T14PI00006 PROJECT REVIEWER: Simon Ramos, EIT, Traffic Engineering, City of Tucson DOT The Signing and Striping Section has completed the reviewed of the PIA plan and recommends a conditional approval of signing and striping plans. The following comments need to be addressed prior to submittal of the mylar plan set for signatures. 1. Traffic Engineering rescinds previous comments dated on July 29th, 2014. 2. ADD "stop signs" on multi-use paths. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6678 or Simon.Ramos@tucsonaz.gov |
08/21/2014 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
08/21/2014 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |