Plan Number: T14PI00003
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T14PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/14/2014 JOSE ORTIZ DOT TRAFFIC REVIEW Denied PLAN #: i-2014-002
ACTIVITY NUMBER: T14PI00003
PROJECT NAME: The Bridges at Block 14
PROJECT ADDRESS: 3070 S Campbell at Duvall Vista
PROJECT REVIEWER: Matthew Geweke, Traffic Eng Tech


Resubmittal Required:
Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal.
The following items must be revised or added to the plan. Please include a brief response letter with the next submittal that states how all comments have been addressed and the original redlined set of plans for back checking.

1. Please update the Signing & Striping Notes from the attached information provided to include the comments regarding oblit scaring and the signing protective film.

2. Please use Pavement Marking Standard 4-7 to create the Kino Blvd right turn bay and bike lane, and to include the R4-4 sign. Note: 5' bike lane with a 13' turn lane suggested.


3. Please use Pavement Marking Standard 4-12 for proper placement of pavement legends. Call out the distances on plans.

4. Please create a note to use Pavement Marking Standard 5-13 at the median bull-noses.

5. The "Right/Left Lane" plaque (R3-5f/R3-5b) mounts above the "Arrow ONLY" (R3-5r/R3-5L) sign.

6. Please make driveways typical with YDS4, pave legends, call-out 10' wide "clear" crosswalks and 4' "clear" STOP bars & signage.


7. See redlines on the submitted drawings Sht 6 to address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

If you wish to email me (Matthew.Geweke@tucsonaz.gov) with PDF's of the revised plan sheets of the required changes prior to the next submittal, we could expedite the Traffic Eng. acceptance of these plans.

Or if you have any questions, I can be reached at 520/837-6665

Thank you.
05/01/2014 ZCANCHO1 DOT ENGINEERING REVIEW Approved SUBJECT: The Bridges at Block 14
PIA Plan T14PI00003

PROJECT REVIEWER: Zelin Canchola,
Permit Center


RESUBMITTAL REQUIRED: Permit Center has reviewed the PIA Plan and recommends approval once the plan number is added, and minor grammatical changes are corrected on the cover sheet.


1. Include the plan number I-2014-002 in the title block of each sheet

2. Include Planning and Development Services Department PIA activity number T14PI00003 on cover sheet

3. Sheet 1 of 10 - Note 9 - Replace "TDOT Permits and Codes" with "Permit Center

4. Sheet 1 of 10 - Note 15 - Replace word "Widwer" with "Witter", replace "(520) 791-5279 EXT. 234" with (520) 791-3191


If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov
05/02/2014 GARY WITTWER DOT LANDSCAPE REVIEW Denied O.K. with plan, but need the following:
1. Change from Blue Palo Verde to Palo brea. (we are not planting any Blue PV due to witches broom)
2. NOTE: Contractor to add irrigation to new trees from existing system. Contact Paul Rosenboom at 837-7852
3. Provide a 6 month hand watering schedule to help establish.
05/16/2014 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Sheet 1 - Note 15 - Please3 change the phone number for Paul Rosenboom to 837-6796.
2. Sheet 2 - Section C-C and Section D-D - Please provide the depthe for the channel toe down.
3. Sheet 3 - 5 - Please provide elevations for all entrances and show drainage direction.

No further comments.

Marc Avery
05/29/2014 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Completed
05/29/2014 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
05/29/2014 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
05/29/2014 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed