Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T14CM06042
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/15/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
12/16/2014 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
12/18/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
12/22/2014 | CPIERCE1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | SHEET A2.1 1. Show details and dimensioning of all existing elements in the "No Build" easement going from the east entrance to the Congress St right of way. a. Fence at door 105 b. Show all accessible route slopes complying with ICC A117.1, Section 403.3; 5% maximum running slope and 2% maximum cross slope. c. Clearly state the status of the "No Build" easement application and show clearly all the construction elements within that easement. 2. Provide a note on the drawings that clearly defines where the temporary walls are located and reference the elevation detail 2/A2.1 and wall section type A-10/A7.0. SHEETS A2.2 AND A2.3 3. Clearly show all elements with in the "No Build" easement and the status of the application. SHEETS A2.1, A2.2 AND A2.3 4. Provide large scale details of both the existing interior stairs and the existing exterior stairs showing all accessible requirements such as dimensions, tread and riser dimensions, landings and exit doors. 5. Provide TRE (temporary revocable easement) for all canopy and balcony overhangs into the public right of way. Provide TRE number on Sheet A0.0. SHEET A2.4 6. Please provide a roof plan only showing upper and lower roofs and no interior partitioning. a. Show all roof drainage systems b. 7/A2.5 mislabeled. There are 2- 6/A2.5s on the sheet. Please reconcile c. Where is detail A/2.5 located? SHEET A4.1 7. At detail 1 what is the sort of football shaped element of the front of the building spanning from the east building edge to the edge of the balcony opening and is approximately 11' above finished grade? a. Please provide structural details and calculations. SHEET A7.0 8. Details W-1 and W-10: Layers are not turned on all the way. Details are not complete. SHEET S2.2 9. Provide structural details and calculations for the exterior mounted window shade canopies. SHEET S2.4 10. Provide structural details and calculations for all new roof top mounted HVAC equipment. 11. Provide Certification for all special inspectors. END OF REVIEW |