Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T14CM06042
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/30/2014 | AROMERO4 | WWM | REVIEW | Completed | |
10/02/2014 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Plan review has been completed and the following corrections are required. Please provide a written response to comments with plan re-submittal. 1) PP A0.0 you've labeled two levels as Level 2 2) PP A1.0 Whereis actual property line on east side? If you wish to use an easement for set-back requirements then file an appeal with the B.O. along with documentation of easement agreement. 3) PP A2.0,2.1,2.2,2.3 Interior exit stairways connecting 4 stories (basement + 3 above ground = 4 connected stories) are required to be within 2 hour rated enclosures. Also provide details for the required 2 hour assembly. 4) PP A2.2 What is keynote 14 at exit balcony? 5) PP A2.3 Where is keynote 17 noted 2 east canopy? 6) General: Provide envelope compliance information per 2012 IECC 7) PP S2.0 a) coordinate keynote legends b) could not locate footing design F2 in calculations c) could not locate column C4 in calculations d) could not locate SSB1 in calculations 8) PP S2.1 could not locate footings F1 & F3 in calculations 9) PP S2.2 a) could not locate B5 & SSB1 justifications for south stair in calculations b) could not locate SSB1 & SSB2 for stair landings in calculations c) could not locate information for SSB3 in plans or calculations If there are questions regarding this review contact: LeeRay 520-837-4906 LeeRay.Hanly@tucsonaz.gov |
10/02/2014 | LHANLY1 | WATER | REVIEW | Passed | |
10/02/2014 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
10/02/2014 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
10/02/2014 | LHANLY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/02/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | ENG will stamp the plan approved after the DRB has been approved. JG |
10/02/2014 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
10/03/2014 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/07/2014 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera Principal Planner PROJECT: T14CM06042 20 E Congress Street Facade Remodel TRANSMITTAL DATE: October 7, 2014 DUE DATE: October 14, 2014 COMMENTS: 01. Zoning cannot approve the building plans for the Façade remodel until the DRB decision letter has been issued and any conditions of the approval are incorporated into the building plans. 02. Zoning is willing to review the building plans as it pertains to the facade changes over the counter with an appointment. Be sure to include the decision letter and the stamped preliminary drawings with the next submittal. If you would like to have the plans reviewed over the counter call in advance for an appointment and I will reserve a time slot. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised building plans if applicable, DRB Decision letter and DRB stamped plans. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/18/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
11/18/2014 | CPIERCE1 | REJECT SHELF | Completed |