| 06/30/2014 | CARL SCHULTZ | FIRE | REVIEW | Reqs Change | MISSING LETTERS ON SHEET A0.1 PLEASE PROVIDE SCOPE OF WORK ON PROJECT PROVIDE HMIS FOR ALL HAZARDOUS MATERIALS STORED AND USED INSIDE FACILITY. OCCUPANT LOADS DO NOT MATCH ON PLANS-KB |
| 07/16/2014 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A0.1; BUILDING CODE SUMMARY: THERE ARE SEVERAL LETTERS AND NUMBERS MISSING. REVISE. 2. SHEET A0.1; BUILDING CODE SUMMARY: THE ACCESSIBILITY CODE SHOULD INCLUDE ONLY THE 2010 ADAAG. REVISE. 3. SHEET A0.1; BUILDING CODE SUMMARY/ZONING CODE SUMMARY: SEVERAL OCCUPANCY LOADS ARE LISTED IN THESE SUMMARIES (4 OCCUPANTS IN 'ALLOWABLE AREA AND HEIGHT'; 6 OCCUPANTS IN 'ZONING CODE SUMMARY'; 49 OCCUPANTS FROM THE EXITING PLAN). SINCE THIS PROJECT INCLUDES THE ENTIRE BUILDING (5120 SF), REVISE THE SUMMARIES FOR THE TOTAL BUILDING OCCUPANT LOAD. 4. SHEET A0.1; BUILDING CODE SUMMARY: VERIFY THE MERCANTILE (M) GROUP IS CORRECT FOR ONE PORTION OF THE BUILDING. 5. SHEET A0.1; EXITING PLAN: VERIFY THE AREA PER OCCUPANT USED IN DETERMINING THE OCCUPANT LOAD IS CONSISTENT. 300 SF PER PERSON AND 100 SF PER PERSON ARE USED IN DIFFERENT F-1 AREAS, AND 300 SF PER PERSON IS USED IN THE MERCANTILE AREA. 6. SHEET A0.1: PROVIDE TITLES AT THE PLANS. 7. SHEET A2.0; BUILDING PLAN: COMPLETE THE WALL NUMBER INDICATOR FOR THE WALL AT GRIDS C AND 3. 8. SHEET A2.0; WALL DESCRIPTION TABLE: WALL NUMBERS E1 AND a WERE NOT LOCATED ON THE PLAN. VERIFY (REFERENCE SPECIFIC SHEET NUMBERS OR DETAILS AS REQUIRED). 9. SHEET A2.0; BUILDING PLAN: VERIFY USING THE IBC TABLE 2902.1 THAT ONLY ONE RESTROOM IS REQUIRED FOR A FACTORY USE (F-1 AND F-2) FACILITY WITH 49 OCCUPANTS. SEPARATE FACILITYES ARE NOT REQUIRED FOR MERCANTILE OCCUPANCIES WITH LESS THAN 100 OCCUPANTS, BUT THE FACTORY PORTIONS ALLOW SEPARATE FACILITIES FOR OCCUPANT LOADS OF 15 OR LESS. 10. SHEET A2.0: PROVIDE TITLES AT THE PLAN AND THE WALL SCHEDULE. 11. SHEET A2.1: PROVIDE A TITLE AT THE PLAN, AND TITLES AND NUMBERS AT THE DETAILS. 12. SHEET A3.0: PROVIDE TITLES AND NUMBERS AT THE ELEVATIONS. 13. SHEET A4.0: PROVIDE TITLES AND NUMBERS AT THE SECTIONS. 14. SHEET A6.0: PROVIDE TITLE AND NUMBER AT THE PLAN. 15. SHEET A7.0: PROVIDE TITLES AND NUMBERS AT THE DETAILS. 16. SHEET A8.0: PROVIDE TITLES AND NUMBERS AT THE ELEVATIONS AND DETAILS. 17. SHEET A8.0: PROVIDE INFORMATION IN THE DOOR SCHEDULE. 18. SHEET S1.0; GENERAL STRUCTURAL NOTES (MASONRY): TWO NOTES IN REFERENCE TO THE MASONRY DESIGN APPEAR TO BE IN CONFLICT. VERIFY. 19. SHEET S2.0 (CANOPY FOUNDATION PLAN); STRUCTURAL CALCULATIONS (PAGE 43 FOOTING TABLE): THE FOOTING TABLE IN THE CALCULATIONS INDICATES THAT THE FOOTINGS AT R2/R3, R3/R3, R4 (FRONT), AND R5 SHOULD USE A 2'-0" SQUARE OR A 2'-0" X 3'-0" OR 2'-0" X 4'-0" FOOTING RETROFITTED TO AN EXISTING FOOTING. THE PLAN AND SECTIONS DO NOT INDICATE THE NEW RETROFIT FOOTINGS. CLARIFY. 20. SHEET S2.0 (CANOPY FOUNDATION PLAN); STRUCTURAL CALCULATIONS (PAGE 43 FOOTING TABLE): THE FOOTING TABLE IN THE CALCULATIONS INDICATES THAT THE FOOTING AT R3 (FRONT) SHOULD USE AN EXISTING SQUARE SPOT FOOTING. THE PLAN INDICATES A NEW FOOTING (F3). CLARIFY. 21. SHEET S2.0; PLAN KEYNOTES: NOTE 7 INDICATES TO POUR THE NEW WALL FOOTING ON TOP OF THE EXISTING FOOTING. PROVIDE AN ANALYSIS OF THE EXISTING FOOTING WITH THE NEW WALL AND FOOTING LOADS. 22. SHEET S2.1; PLAN KEYNOTES: NOTE 6 INDICATES TO ATTACH THE SHIP'S LADDER TO THE EXISTING BUILDING WITH 5/8" DIAMETER EPOXY ANCHORS. PROVIDE A DETAIL, OR REFERENCE AN ARCHITECTURAL DETAIL ON A4.0. COORDINATE THE CONNECTION WITH THE ARCHITECT. 23. SHEET S3.0; DETAIL 105: NOTE 1 WAS NOT LOCATED ON THE SECTION. VERIFY. 24. SHEET S4.0; DETAIL 201: NOTE 5 WAS NOT LOCATED ON THE DETAIL. VERIFY. 25. SHEET S4.0; DETAIL 204: REVISE THE VERBIAGE IN NOTES 4 AND 5. 26. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 07/17/2014 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the envelope compliance certificate to provide a valid analysis of the energy compliance for the building (see the notation in the red bar in Section 3 of the Envelope Compliance Certificate). 2. Specify the height above grade of the termination of the welding hood exhaust. 3. Clarify how the infra red heaters are to be mounted 14' AFF with 20" clear above the heaters. |
| 07/17/2014 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide the gutter dimensions and the area of each section of roof each gutter drains. |
| 07/17/2014 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size of the water meter and show its location on the site plan. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/09/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |