Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T14CM01004
Parcel: 13705168A

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T14CM01004
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/05/2014 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Cleanfreak $3 Carwash
T14CM01004
Building Plan (2nd Review)

TRANSMITTAL DATE: May 5, 2014

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning has reviewed the building plans but cannot approve until the development package has been approved for the site change

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
05/07/2014 KEN VAN KARSEN ELECTRICAL-COMMERCIAL REVIEW Completed
05/08/2014 JASON GREEN ENGINEERING REVIEW Reqs Change Building plan will be approved upon approval of the DP14-0029. JG
05/12/2014 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
05/14/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Clarify how exterior wall #2 in the Envelope Compliance Certificate is to be built and show this on the drawings; the description states that the wall will have R-1.1 cavity insulation and R-20 continuous insulation. In addition, the roof is described as having R-38 cavity insulation but it is not indicated on the drawings. [Initial comment: Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.]
2. Provide a copy of the manufacturer's description of the features for the proposed programmable thermostat. [Initial comment: Verify that the specified controls provide the capabilities noted in the COMcheck Generic Requirements #5 and #6 on sheet M2.0. Reference: Section C403.2.4, IECC 2012.]
05/14/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Neither the architectural nor the structural drawings provided details to show how the water heater shelf is to be attached to the building structure "…as appropriate." [Initial comment: Provide structural calculations and details to show how the proposed water heater support is to be connected to the building structure. Reference: Section 301.2, IPC 2012.]
2. Based on your response, the rim elevation of the next upstream manhole (9918-A64A, 2455.90') is less than 12" below the finished floor elevation of the car wash tunnel (2456.80') and a backwater valve is required for the car wash tunnel. The finished floor elevation for the car wash building is more than 12" above the rim elevation of the next upstream manhole so no backwater valve is required for the car wash building. [Initial comment: Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson.]

Final Status

Task End Date Reviewer's Name Type of Review Description
05/16/2014 SHANAE POWELL OUT TO CUSTOMER Completed
05/16/2014 CPIERCE1 REJECT SHELF Completed